Skip to main content

City of Madison

Image: Public Works Header

PUBLIC WORKS CONTRACTS

PROJECTS

Helpful Hint: You can use the arrows to sort the projects by values in each column. Use Sort Ascending to sort ascending order. Use Sort Descending to sort descending order.
Due Date
Sort Ascending Sort Descending
Contract #
Sort Ascending Sort Descending
Project #
Sort Ascending Sort Descending
Project
Sort Ascending Sort Descending
12/19/24 9610 17085 Imagination Center at Reindahl Park
03/27/25 9606 11230 Metro Transit Phase 3A - Maintenance and Driver Facility Improvements
11/14/24 9605 14915 Prairie Hills Detention Basin Improvements
Future Project 9593 15165 Pressure Zone 4 Interstate Crossing
02/27/25 9591 15271 Capital City Trail Storm Sewer
Future Project 9590 14717 Warner Lagoon Dredging
02/13/25 9589 15427 Northeast Regional Pond Repair
03/13/25 9588 15426 West Badger Mill Creek Greenway Dredging
03/13/25 9587 15425 Attic Angels Greenway Repairs
03/13/25 9586 14063 Manitou/Nakoma Box Culvert Replacement
10/09/25 9585 13863 Warner Park Lagoon Channel Improvements
09/04/25 9584 15356 MMSD Drying Beds
10/17/24 9582 13065 LED Street Light - Federally Funded
11/07/24 9572 15429 N Lake Street Boat Ramp
08/29/24 9561 15332 Paterson Street Sanitary Sewer Assessment District - 2024
12/18/25 9551 15145 Rennebohm Park Sprayground
12/19/24 9550 15148 Yahara Hills Golf Course Pump House and Irrigation Improvement
Future Project 9549 15342 Bikeways 2025
Future Project 9548 13016 Far West Public Works Operations Building
12/19/24 9547 15327 East Madison Bikeways: Safe St
07/11/24 9546 15215 MWU Olin Ave. Admin Bldg Roof Replacement
08/29/24 9536 15295 CIPP Lining Rehabilitation - Blair Street Sanitary Sewer Siphon
11/21/24 9535 15294 CIPP UV Lining Ph2 2024
12/18/25 9532 13160 Library Service + Support - Siding Replacement
12/18/25 9529 14598 2024 Park Sun Shelter Installation
06/13/24 9527 15215 MWU Olin Ave. Admin Bldg Roof Replacement
04/25/24 9526 14015A 2024 Rennebohm Park East Tennis Courts
04/25/24 9525 15055 2024 Sport Court Resurfacings
06/13/24 9522 13573 20 is Plenty
06/27/24 9521 15109 2024 Playground Improvements
11/14/24 9517 14370 Pheasant Branch Greenway Enhancement
Future Project 9510 14074 BPS 213 Booster Upgrade
04/04/24 9509 15055 2024 Sport Court Resurfacings
04/04/24 9508 15102 CIPP 2024 Water Main Rehabilitation
04/04/24 9506 14595 Warner Park Dog Park Lot Resurfacing
02/08/24 9503 14933 Sycamore Singletrack Trail Improvements 2024
06/27/24 9502 17196 Warner Park Community & Recreation Center Expansion
04/04/24 9501 15045 Lake Street Sanitary Sewer Replacement - 2024
04/04/24 9500 14015A 2024 Rennebohm Park East Tennis Courts
04/25/24 9497 14121A Streets West Facility HVAC and Lighting Upgrade
02/08/24 9495 45300 Semi Permanent Epoxy Pavement Marking
03/21/24 9493 82145D Parking Garage Maintenance
07/18/24 9489 14920 3400 BLK E Washington Sewer Repl
05/09/24 9487 14923 CIPP UV LINING REHABILITATION OF SEWERS PHASE 1 – 2024
08/29/24 9486 14921 Commercial Avenue Sanitary Sewer Reconstruction
03/07/24 9485 14525 Rennebohm Park Shelter Restroom Renovation
08/05/21 9478 13724 Westview Hills Channel
03/04/21 9446 54250 2021 Tennis and Basketball Court
03/04/21 9440 13363 CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021
06/08/23 9439 12882 Mendota Grassman Greenway
Future Project 9438 12568 Old Sauk Trails Business Park - Phase 1
01/26/23 9437 11066 East Towne Pond
Future Project 9436 11737 Old Sauk Trails Business Park - Ph 2
Future Project 9435 12146 Mendota-Spring Harbor Greenway
08/25/22 9433 12916 Spring Harbor Dredging
10/20/22 9432 11704 Hawks Landing Flood Mitigation North
01/06/22 9430 12960 Sprecher Road Greenway Improvements
02/18/21 9429 13371 Mall/Concourse Maintenance Protective Flooring Replacement
03/05/20 9428 12774 Warner Lagoon Pier and Ice Access
11/07/19 9426 12710 CIPP Rehab of Sanitary and Storm Sewer Mains - 2019
06/20/19 9415 19033 2019 Glacier Hill Park Sun Shelter Installation
04/25/19 9414 17525 2019 Playground Replacements
04/25/19 9412 11842 West Elderberry Sanitary Sewer Interceptor - 2019
05/23/19 9411 12011 McKenna Boulevard Flood Mitigation
Future Project 9410 16122 Overture Center Garage
05/16/19 9404 17390 Reindahl Park Barn Improvements
05/09/19 9403 19021 Park Paving 2019
05/09/19 9400 17451 Fire Station 14 (2018) & Fire Station 14 Training Tower (2019)
05/23/19 9398 17526 2019 Playground Replacements - Group 2
07/25/19 9397 11021 Truck Scales Project
12/21/23 9390 14980 Lower Badger Mill Creek Pond Restoration
01/11/24 9389 14933 Sycamore Singletrack Trail Improvements 2024
11/09/23 9377 11168 University Avenue Reconstruction
12/18/25 9374 14917 West Badger Mill Creek - Elver Park Greenway
09/04/25 9373 14914 Stormwater Quality Screen Structures
09/21/23 9365 14369 Railroad Arch Culvert Repair at Southwest Path
03/21/24 9362 13810 Ohmeda Drive Assessment District - 2022
11/09/23 9361 14145 State Street Campus Garage Replacement
03/21/24 9359 13937 Country Grove Park Shelter
05/23/24 9358 13346 Bartillon Homeless Shelter
09/07/23 9357 14156 IT Fiber Install 2023
08/10/23 9346 8214556C 2023 Parking Garage Maintenance
02/08/24 9342 14092 Well 15 PFAS Treatment Facility
09/21/23 9336 14413 229 Felland Road Booster Pump Install
08/10/23 9335 14487 CIPP UV Lining Phase 2
11/09/23 9334 14412 B Robin Greenway Restoration
07/13/23 9333 14412 A Robin Greenway Storm and Grading
01/11/24 9329 14203 Fire Station #14 Training Site Phase 1
06/08/23 9327 13930 Penn Park Courts Reconstruction
06/22/23 9326 14334 Door Creek Park Shelter
08/24/23 9322 14530 Fire Station 2 Lighting Retrofit
05/04/23 9320 14245 Fire Station 4 Lighting Retrofit
05/25/23 9319 14659 CIPP Water Main Rehab 2023 - Lake Mendota Drive
05/25/23 9319 14643 CIPP Water Main Rehab 2023 - Fish Hatchery Road
Future Project 9318 12347 Olin Waste Transfer Drop-off
05/25/23 9317 8214556C 2023 Parking Garage Maintenance
Future Project 9314 14121 Streets East Wash Bay Steel Column and Panel Repairs
04/20/23 9313 12728 Madison Senior Center Courtyard
04/20/23 9312 12457 Truax Lift Station Replacement - 2021
04/20/23 9306 13930 Penn Park Courts Reconstruction
11/09/23 9304 14439 Northport Drive & School Road
03/09/23 9299 45300 Semi Permanent Epoxy Pavement Marking
05/04/23 9298 14537 2023 West Parks Playground Replacements
07/06/23 9297 12410 Madison Public Library Lighting (various locations)
12/14/23 9289 10448 Unit Well 19 Treatment System Addition
03/09/23 9286 14486 CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
03/09/23 9285 14485 CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
02/09/23 9280 14246 Fire Station 10 Lighting Retrofit
02/23/23 9279 13934 2023 Inclusive Playgrounds
02/23/23 9270 13930 Penn Park Courts Reconstruction
02/09/23 9269 13432 2023 Sport Court Resurfacings
12/22/22 9262 14320 CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 (Rebid)
03/09/23 9249 12728 Madison Senior Center Courtyard
12/18/25 9246 13860 West Towne Pond Flood Mitigation
04/20/23 9245 14334 Door Creek Park Shelter
12/01/22 9244 16122 Overture Center Garage
01/26/23 9243 45300 Semi Permanent Epoxy Pavement Marking
04/06/23 9240 14245 Fire Station 4 Lighting Retrofit
08/15/24 9238 14374 Burr Jones Shoreline Repair
09/07/23 9235 14369 Railroad Arch Culvert Repair at Southwest Path
08/15/24 9234 14368 Schroeder Rd Flood Mitigation
Future Project 9233 14367 Westside Impact Fee District
12/01/22 9230 14246 Fire Station 10 Lighting Retrofit
09/29/22 9228 14027 Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26
04/06/23 9226 12393 Phase 2 of CCB City Office Remodels, First and Fifth Floors
08/04/22 9210 14296 Mineral Point Landfill 2022 Gas Construction
08/25/22 9209 14320 CIPP Wet Lining Rehabilitation of Sanitary Sewers - 2021 (Rebid)
08/25/22 9201 13710 O.B. Sherry Park - 3457/3461/3465 Milwaukee St. Demolition and Site Restoration
08/25/22 9200 14027 Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26
08/25/22 9200 13939 Replacement of booster pumps and associated piping/appurtenances at Unit Wells 12 & 26
Future Project 9198 14273 Solar PV – Fire Station 01
Future Project 9197 14274 Solar PV – Fire Station 08
Future Project 9196 14275 Solar PV – Streets South Point Warm Storage
08/25/22 9195 13716 Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge
06/09/22 9188 13935 2022 Warner Park Inclusive Playground
07/07/22 9179 14015 2022 Rennebohm Park West Tennis Courts
04/28/22 9178 13836B Solar PV – Fire Station 02
08/04/22 9176 16122 Overture Center Garage
08/15/24 9174 10525 McPike Park (formerly Central Park)
05/26/22 9173 14093 2022 CIPP Water Main Rehab Lake Mendota Dr
04/14/22 9172 13934 2023 Inclusive Playgrounds
05/12/22 9169 14073 Median Conversion - Concrete 2022
04/28/22 9168 8214556B 2022 Parking Garage Maintenance
09/29/22 9162 13836C Solar PV – Water Utility Paterson Vehicle Storage
04/07/22 9161 13836B Solar PV – Fire Station 02
08/04/22 9160 14270 Solar PV - Streets Waste Transfer Station
03/24/22 9159 13369 Senior Center Lighting Replacement
04/14/22 9151 13931 Cannonball Single Track Trail Improvements 2022
Future Project 9149 13862 Atwood Avenue Flood Mitigation
Future Project 9147 13879 Regent and Kenosha Culvert Replacement
03/03/22 9146 13836 Green Power 2022-Solar Installations
03/24/22 9138 13934 2023 Inclusive Playgrounds
01/20/22 9136 10950 Metro Transit Hanson Rd Satellite Bus Facility Remodel
Future Project 9135 11078 Fairchild Building HVAC Upgrade and Structural Repair
01/20/22 9131 16126 State Street Capitol Garage Relighting and Electrical Controls and Upgrade
02/03/22 9127 13357 Tenney Park East Johnson St. Pedestrian Bridge Wing Walls
04/28/22 9125 14099 MPD East Fence
02/03/22 9118 13895 2022 Sport Court Resurfacings
Future Project 9115 11596 NE NEIGHBORHOOD SANITARY IMPACT FEE
10/05/23 9108 13872 Parkside Drive Sanitary Sewer Replacement
08/04/22 9107 13871 CIPP Sewer Lining 2022
Future Project 9106 13870 Capitol City Trail Bike Roundabout
Future Project 9105 13867 Pumpkin Hollow Sanitary Sewer Impact Fee District
Future Project 9104 11942 Arbor Hill Greenway Screen Structure
05/12/22 9103 13800 Worthington Avenue Sanitary Replacement
05/12/22 9102 11850 1622 Fordem Avenue Sanitary Sewer Replacement
12/16/21 9087 10950 Metro Transit Hanson Rd Satellite Bus Facility Remodel
10/26/23 9086 10950 Metro Transit Hanson Rd Satellite Bus Facility Remodel
10/07/21 9079 12410 F Madison Public Library Lighting - Sequoya
09/23/21 9063 11672 Thurber Lift Station Replacement
08/05/21 9057 13566 CIPP 2021 - E. Johnson St
08/05/21 9056 13565 CIPP 2021 - Pontiac Trl, Nokomis Ct, Rosewood Cir
08/05/21 9055 13474 Summit Maintenance Facility Improvements 2021
09/09/21 9050 12856 Olin Park Facility Improvements
06/24/21 9042 13132 Madison Fire Station 05 Wall Removal & Improvements
06/03/21 9039 13453 Park Paving 2021
07/08/21 9035 13491 Greentree Hills Landfill West Header Replacement
06/03/21 9026 13451 2021 Playground Improvements
03/18/21 9014 13265 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2021
01/21/21 9007 12410 Madison Public Library Lighting (various locations)
01/21/21 9006 13217 Well 18 Treatment
05/20/21 9004 13279 Fire Station 10 - Retaining Wall
12/17/20 8997 13217 Well 18 Treatment
12/17/20 8996 13307 Heim Building HVAC Replacement
04/15/21 8992 13267 Sidewalk, Curb&Gutter, Citywide Installation and Repair 2021
03/11/21 8991 13265 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2021
02/18/21 8990 13253 Resurfacing 2021
02/18/21 8989 13253 Resurfacing 2021
02/25/21 8988 13253 Resurfacing 2021
03/11/21 8987 13221 Sidewalk Program 2021, Ald. District 14
03/18/21 8986 13220 Sidewalk Program 2021, Ald. District 13
11/19/20 8985 12675 Street End Repairs - (FEMA 81336)
02/18/21 8984 11229 Metro Transit E. Wash Upgrades
05/27/21 8981 11230 Metro Transit Phase 3A - Maintenance and Driver Facility Improvements
12/17/20 8961 12410 Madison Public Library Lighting (various locations)
03/04/21 8960 12410 B Madison Public Library Lighting - Alicia Ashman
06/25/20 8930 12371 Traffic Median Revegetation Trial Project
07/23/20 8922 10525 McPike Park (formerly Central Park)
06/25/20 8920 12999 Allis/Spaanem/Shaffer Water Main
09/24/20 8916 12890 Gates of Heaven Exterior Restoration
05/28/20 8913 12371 Traffic Median Revegetation Trial Project
05/07/20 8907 12315 Orchard Street Sanitary Sewer Repair
07/02/20 8904 12679 2020 Playground Improvements - Group 3
04/30/20 8901 12687 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020
11/05/20 8899 12851 2020 Galaxy Park Sun Shelter Installation
06/25/20 8898 12661 UW 26 Booster Pump Upgrade
05/21/20 8893 17473 Gates of Heaven
06/25/20 8891 11021 Truck Scales Project
04/23/20 8885 8214556X 2020 Parking Garage Maintenance
04/09/20 8882 12881 Olbrich Roof Replacements
08/06/20 8879 12857 Tenney Park Pavilion Acoustic Plaster Ceiling
06/10/21 8878 11672 Thurber Lift Station Replacement
04/09/20 8877 12315 Orchard Street Sanitary Sewer Repair
07/13/23 8876 12750 Wexford Pond Dredging
03/09/23 8875 11063 Lower Badger Mill Creek Pond
09/08/22 8873 12457 Truax Lift Station Replacement - 2021
12/18/25 8872 11730 SAUK CREEK GREENWAY
08/20/20 8871 10956 MPD Central Property/GR 10 Carpet Replacement
09/24/20 8870 12755 CIPP Rehab 2020
09/23/21 8868 12456 Harper Lift Station Replacement
Future Project 8866 12749 Yahara River Parkway Screen Structure
05/28/20 8864 12989 E. Gorham Street Resurfacing: Utilities
Future Project 8863 11596 NE NEIGHBORHOOD SANITARY IMPACT FEE
09/03/20 8861 13195 GLENWOOD CHILDRENS PARK STORM 2020
04/07/22 8860 12869 FEMA Shoreline Repairs - 2022
Future Project 8859 12154 Spring Harbor Outfall Repair
05/21/20 8858 12327 Felland Road Water Main Extension Phase 1
04/09/20 8853 12827 Park Paving 2020
07/09/20 8850 11971 WARNER PARK BEACH SHELTER
04/23/20 8849 12676 2020 Playgrounds - Group 1
08/07/25 8809 15486 Orchard St, Charter St Alley Recon
Future Project 8808 15416 2025 Resurfacing
Future Project 8807 15416 2025 Resurfacing
05/08/25 8806 15123 Buffalo Trail, Barron Court, Green Lake Pass Resurfacing w/Utilities
05/22/25 8801 14782 Green Ave Resurfacing
02/13/25 8800 15200 2025 Safe Streets
05/22/25 8799 15417 Sugar Maple Ln Recon
03/13/25 8798 15416 2025 Resurfacing
03/27/25 8797 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor
03/27/25 8796 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor
03/27/25 8795 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor
03/27/25 8794 15415 Chip Seal West, Chip Seal East, Crack Seal Major, Crack Seal Minor
05/08/25 8792 15379 Citywide SW
04/17/25 8791 15378 Sawcutting Dist 10 & 20
02/27/25 8790 15378 Sawcutting Dist 10 & 20
04/17/25 8789 15377 Sidewalk Dist 20
02/27/25 8788 15376 Sidewalk Dist 10
06/20/25 8787 14987 W Mifflin St Plaza Recon
10/30/25 8786 15120 MacArthur Rd, Larson Ct, Sycamore Ave Recon
05/08/25 8785 15219 Meyer Rd Recon
09/04/25 8784 15125 E Main St, Hancock St Resurf
03/13/25 8783 11822 Shawnee Pass Recon, Nakoma Rd Sidewalk
03/27/25 8782 14481 Davidson St, Park Ct, Maher Ave, Gary St Recon
04/17/25 8781 11825 Evergreen Ave, Ohio Ave, Sommers Ave Recon
09/26/24 8770 10169 West Towne Path Ph 2a
12/19/24 8769 15104 North Shore Dr Path
08/29/24 8767 14334 Door Creek Park Shelter
02/13/25 8766 15113 Franklin St Resurfacing w/Utilities
Future Project 8763 14143 Badger Rusk Shared-Use Path
11/30/23 8762 13924 Hammersley Road Resurfacing w/Utilities Phase 2
Future Project 8761 11168 University Avenue Reconstruction
11/21/24 8759 14780 Starker Ave Resurfacing w/Utilities
04/04/24 8758 14817 Sidewalk, Curb & Gutter, Citywide Installation & Repair 2024
02/13/25 8757 14890 Bartillon Path
02/22/24 8756 14818 2024 Sidewalk Sawcutting
02/08/24 8755 14818 2024 Sidewalk Sawcutting
02/08/24 8754 14816 Sidewalk Ordered 2024 Ald Dist 19
03/21/24 8753 14815 Sidewalk Ordered 2024 Ald Dist 11
04/04/24 8752 14814 Pavement Crack Repair & Chip Seal 2024
04/04/24 8751 14814 Pavement Crack Repair & Chip Seal 2024
04/04/24 8750 14814 Pavement Crack Repair & Chip Seal 2024
Future Project 8749 14814 Pavement Crack Repair & Chip Seal 2024
03/13/25 8748 14813 Bridge Repair 2024
05/22/25 8747 14781 Pflaum Rd Resurfacing w/Utilities
03/28/24 8746 14389 W. Washington Ave & S. Henry Resurfacing w/utilities
05/23/24 8745 14764 Stevens St Resurfacing w/ Utilities
06/27/24 8744 14763 Atticus Way
02/22/24 8743 14083 Lake Mendota Dr and Norman Way Reconstruction
07/18/24 8742 14076 Rutledge Street Reconstruction
Future Project 8741 14812 Evergreen/Center/Willard/Ohio Reconstruction
05/09/24 8740 14762 Hermina St/Union St Reconstruction
03/13/25 8739 14761 Tancho Dr Bike Path
03/07/24 8738 14896 2024 Resurfacing
03/07/24 8737 14896 2024 Resurfacing
03/07/24 8736 14896 2024 Resurfacing
04/04/24 8735 11543 E. Wilson/E. Doty Street Reconstruction
Future Project 8733 14636 Hawthorne Court Reconstruction - 2026
06/08/23 8732 14346 Pavement Crack Repair and Chip Seal 2023
06/08/23 8731 14346 Pavement Crack Repair and Chip Seal 2023
06/22/23 8728 14156 IT Fiber Install 2023
03/09/23 8727 13716 Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge
04/20/23 8721 13015 W. Main Street Bike Boulevard Improvements
12/01/22 8720 12434 Senior Center First Floor Folding Partition Installation
Future Project 8719 14388 New Sidewalk/Path Installation 2023
02/08/24 8717 12777B Mineral Point Road Widen Sidewalk (for East-West Bus Rapid Transit)
12/15/22 8716 13925 East-West Bus Rapid Transit Improvements
02/23/23 8715 14082 Lake Mendota Drive Reconstruction
03/09/23 8713 14337 Sidewalk sawcutting 2023
03/28/24 8712 14078 Lowell Street Reconstruction
11/30/23 8711 14081 Harvey St & Schmitt Pl Reconstruction
09/21/23 8710 14080 S. Owen Drive Reconstruction
05/23/24 8709 14079 Doncaster Dr, Beverly Rd, Danbury St Reconstruction
02/27/25 8708 13664 Hermina St: Ped Bike Bridge over Starkweather Creek
06/08/23 8707 11860 a John Nolen Bridge Repairs - 2023
02/23/23 8706 14349 Sidewalk Ordered 2023 AD 18
03/09/23 8705 14348 Sidewalk Ordered 2023 AD 12
02/23/23 8704 14347 Resurfacing 2023
02/23/23 8703 14347 Resurfacing 2023
02/23/23 8702 14347 Resurfacing 2023
03/09/23 8701 14346 Pavement Crack Repair and Chip Seal 2023
03/09/23 8700 14346 Pavement Crack Repair and Chip Seal 2023
03/09/23 8699 14346 Pavement Crack Repair and Chip Seal 2023
03/09/23 8698 14346 Pavement Crack Repair and Chip Seal 2023
02/23/23 8697 14337 Sidewalk sawcutting 2023
02/08/24 8696 14336 Bikeways 2023
04/11/24 8695 14199 Safe Streets Madison 2024
12/01/22 8694 14216 S. Pinckney Street Resurfacing w/Storm
12/14/23 8693 14215 Sheboygan Ave & N. Segoe Rd Resurfacing w/Utilities
01/26/23 8692 14335 Felland Road Reconstruction
09/15/22 8691 12777A East-West Bus Rapid Transit Early Works Improvements
05/12/22 8690 13716 Bridge Repairs 2022/2023-Painting Alicia Ashman Ped Bridge
04/07/22 8689 13719 Pavement Crack Repair and Chip Seal 2022
04/07/22 8688 13719 Pavement Crack Repair and Chip Seal 2022
04/07/22 8687 13719 Pavement Crack Repair and Chip Seal 2022
07/13/23 8659 14075 Willard/Sommers/Center/Hudson/Miller Reconstruction
08/04/22 8658 13715 Bikeways 2022(2023 construction)
07/07/22 8657 13923 Safe Streets Madison 2022
07/07/22 8655 13480 W. Washington Ave & Henry St Intersection Improvement
08/25/22 8654 44001 West Badger Rd. Salt Barn
10/20/22 8653 13617 Olin Avenue Waste Transfer Station Concrete floor replacement
Future Project 8651 13923 Safe Streets Madison 2022
03/17/22 8650 13175 Old Middleton Rd & Craig Ave Resurfacing w/Utilties
Future Project 8648 14023 Waste Drop Off Site at Streets Transfer Station
06/09/22 8647 13480 W. Washington Ave & Henry St Intersection Improvement
07/07/22 8644 13715 Bikeways 2022(2023 construction)
06/23/22 8643 13923 Safe Streets Madison 2022
04/06/23 8642 13014 West Towne Path - Phase 3
01/26/23 8641 13169 Braxton Pl Resurfacing & La Mariposa Lane(new street)
Future Project 8640 11959 Old Middleton Road Underpass of WSOR Railroad
04/07/22 8636 13719 Pavement Crack Repair and Chip Seal 2022
06/13/24 8635 13812 Knutson Drive Reconstruction
04/07/22 8634 13721 Sidewalk, Curb&Gutter, Citywide Installation and Repair 2022
03/03/22 8633 13717 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2022
03/03/22 8632 13720 Sidewalk Program 2022, Ald. District 5
07/11/24 8626 13713 Olin-Turville Ct and E. Lakeside St Resurfacing w/Utilities
07/11/24 8626 15269 OLIN-TURVILLE RECONSTRUCT
07/07/22 8625 13709 Lake Mendota Dr & Capital Ave Reconstruction
05/12/22 8624 13708 Russell Street Reconstruction
06/09/22 8623 13707 Tokay Boulevard Resurfacing w/Utilities
03/24/22 8622 13706 S. Owen, Caromar, Keating Resurfacing w/Utilities
09/08/22 8621 13705 Hammersley Road Resurfacing w/Utilities Phase 1
Future Project 8620 13704 Anderson Street Resurfacing w/Utilities
03/03/22 8619 13703 Resurfacing 2022
03/03/22 8618 13703 Resurfacing 2022
03/03/22 8617 13703 Resurfacing 2022
02/17/22 8616 12907 St. Paul, Ohio, Talmadge,Jackson and LaFollette Reconstruction
08/05/21 8615 13418 Aberg Avenue & NB Packers Avenue Ramp traffic signal
07/08/21 8614 13264 Local Road Traffic Calming & Arterial Ped Enhancements 2021
05/20/21 8613 11021 A Sycamore Park Parking Lot Repavement
09/09/21 8609 13342 Madison Police Training Center Office Roof Replacement
12/16/21 8606 12444 South Point Rd. Truck Scale and Fuel Point
06/09/22 8605 44001 West Badger Rd. Salt Barn
06/03/21 8604 12410 F Madison Public Library Lighting - Sequoya
Future Project 8603 12410 E Madison Public Library Lighting - Goodman South Madison
Future Project 8602 13370 Streets West Badger Lighting
02/17/22 8601 13369 Senior Center Lighting Replacement
05/20/21 8600 12410 D Madison Public Library Lighting - Meadowridge
04/08/21 8599 12410 C Madison Public Library Lighting - Lakeview
05/12/22 8598 17040 Fire Station 06 Remodel
09/14/23 8595 10069 Madison Public Market
02/17/22 8592 13258 Engineering Operations Facility - Canopy Replacment/Expansion
04/08/21 8591 8214556A 2021 Parking Garage Maintenance
Future Project 8590 12437 Waste Transfer Paving Extension
Future Project 8589 13160 Library Service + Support - Siding Replacement
Future Project 8588 13345 Overnight Men's Shelter
07/13/23 8587 13343 Tenney Park Beach Shelter
07/14/22 8586 12789 Reindahl Restroom Remodel
06/03/21 8585 13282 Dearholt Rd Resurfacing w/Utilities
05/27/21 8584 13324 N. Park Street Paver Repair & State Street Sidewalk Joint Repair
02/09/23 8583 13011 Halo Lane and Twilight Trail Reconstruction
04/08/21 8582 13266 Pavement Crack Repair and Chip Seal 2021
04/08/21 8581 13266 Pavement Crack Repair and Chip Seal 2021
04/08/21 8580 13266 Pavement Crack Repair and Chip Seal 2021
04/08/21 8579 13266 Pavement Crack Repair and Chip Seal 2021
02/18/21 8578 11132 Park St Pavement Joint Repair (2019 inbound:2021 outbound)
06/24/21 8577 13271 Forster Drive Resurfacing w/Utilities
04/29/21 8576 13180 N. Brooks St, Fahrenbrook Ct, College Ct Resurfacing w/Utilites
05/06/21 8575 13141 Bridge Repairs 2021
05/20/21 8574 13173 W. Washington Avenue Resurfacing s/Utilities
10/21/21 8573 13179 Kronke Dr, Tanager Trl & Lanett Cir
02/25/21 8572 12952 Starkweather Drive Reconstruction
02/25/21 8572 10160 Garver Path
06/24/21 8570 13264 Local Road Traffic Calming & Arterial Ped Enhancements 2021
06/10/21 8569 11189 Helena St/Russell St/Jenifer St Reconstruction
03/03/22 8568 13175 Old Middleton Rd & Craig Ave Resurfacing w/Utilties
06/24/21 8567 13177 Melvin Ct & Ridgeway Ave Resurfacing w/Utilities
05/11/23 8566 13170 Davies St & Dempsey Rd Reconstruction
06/10/21 8565 13176 Hooker Ave, Sheridan Dr, Steensland Dr Resurfacing w/Utilities
05/27/21 8564 13270 Felland Rd & Tranquility Trl Roundabout
06/24/21 8563 13097 Bikeways 2021
05/22/25 8562 13171 Pontiac Trl, Boston Ct, Nokomis Ct, Rosewood Ct Recon
04/22/21 8561 12195 Hillcrest Dr, Alden Dr, Standish Ct Reconstruction
06/25/20 8560 85100X West Transfer Point Concrete Joint Repair 2020
04/09/20 8558 12690 Pavement Crack Repair and Chip Seal 2020
04/09/20 8557 12687 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020
04/23/20 8555 12487 Prairie Road/Raymond Road Intersection Improvement
05/21/20 8554 12950 Highland Avenue Sidewalk and Lighting Improvements
02/20/20 8543 11446 RIMROCK INTRCPTR-INDUSTRIAL DR EXT
02/06/20 8542 11399 Spring Harbor Greenway at Masthead (Nautilus Pond Reconstruction)
05/21/20 8538 12681 2020 Playgrounds - Group 2
05/21/20 8538 12678 2020 Playgrounds - Group 2
04/09/20 8536 12746 McKenna Blvd Flood Mitigation - Phase 2 (Greentree Pond to N Struck St)
02/06/20 8535 11229 Metro Transit E. Wash Upgrades
02/20/20 8534 12780 2020 Tennis and Basketball Court Resurfacings
12/19/19 8532 12698 UV CIPP Rehab of Sanitary Sewers - 2019
01/16/20 8526 51004 Reynolds Park - Water Utility Rooftop Lighting
09/09/21 8525 12154 Spring Harbor Outfall Repair
12/05/19 8521 12675 Street End Repairs - (FEMA 81336)
02/20/20 8516 12695 Livingston Street Reconstruction
06/04/20 8515 12688 Local Road Traffic Calming & Arterial Ped Enhancements 2020
05/21/20 8514 12717 Julia Street & Julia Court Resurfacing
05/28/20 8513 12693 Rethke Avenue Reconstruction
04/28/22 8512 14056 New Sidewalk Installation 2022
04/09/20 8511 12686 Bridge Repairs 2020: Sycamore Ave over Starkweather Creek
03/19/20 8510 12690 Pavement Crack Repair and Chip Seal 2020
03/19/20 8509 12690 Pavement Crack Repair and Chip Seal 2020
03/19/20 8508 12690 Pavement Crack Repair and Chip Seal 2020
03/19/20 8507 12690 Pavement Crack Repair and Chip Seal 2020
04/30/20 8506 10225 Anderson Street Resurfacing
01/20/22 8505 11202 Cedar Street Reconstruction
01/20/22 8505 13062 Cedar Street (relocate Appleton Rd)
01/21/21 8504 12956 South Street, W. Wingra Drive & High Street(recon) Resurfacing w/Utilities
01/21/21 8504 11866 Cedar Street (new street)
12/03/20 8503 11190 Dunning St, Jackson St & LaFollette Ave Reconstruction
03/19/20 8502 12564 Packers Avenue Resurfacing w/Utilities
03/05/20 8501 11188 Gregory/Cross/Copeland/Western Reconstruction
02/20/20 8500 11164 Martin Luther King Jr. Blvd Sidewalk Replacement
03/05/20 8499 12365 Bikeways 2020
12/03/20 8498 12694 Rockstream Drive (new street)
04/09/20 8497 12692 Sidewalk, Curb&Gutter, Citywide Installation and Repair 2020
03/19/20 8495 12687 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2020
03/19/20 8493 12612 Sidewalk Program 2020, Ald. District 4
03/19/20 8493 12613 Sidewalk Program 2020, Ald. District 8
02/20/20 8492 12691 Resurfacing 2020
02/20/20 8491 12691 Resurfacing 2020
02/20/20 8490 12691 Resurfacing 2020
12/05/19 8484 45300 Semi Permanent Epoxy Pavement Marking
11/07/19 8483 12698 UV CIPP Rehab of Sanitary Sewers - 2019
11/19/20 8480 19050 Tenney Park Lagoon Biostabilization
11/07/19 8479 17390 Reindahl Park Barn Improvements
Future Project 8473 12154 Spring Harbor Outfall Repair
08/22/19 8468 11845 Storm Structural Repairs 2019
09/05/19 8466 12481 Southwest Bikepath Culvert Replacement at Waite Circle - 2019
08/22/19 8465 11021 Truck Scales Project
08/08/19 8461 11989 CIPP Rehab of Sanitary and Storm Sewers - 2019
08/08/19 8460 10985 Sauk Creek Greenway - Tree Lane to High Point
09/05/19 8459 10955 MPD Central Painting & Carpet Replacment
07/11/19 8456 19391 Summit West Maintenance Facility Improvements 2019
07/25/19 8455 19021 Park Paving 2019
07/11/19 8453 19033 2019 Glacier Hill Park Sun Shelter Installation
09/19/19 8441 17365 North Star Dog Park
09/19/19 8430 11471 Judge Doyle Garage(20017) Government East Ramp Demolition(2019)
06/06/19 8427 17451 Fire Station 14 (2018) & Fire Station 14 Training Tower (2019)
06/06/19 8425 19021 Park Paving 2019
07/25/19 8423 17421 2019 Northland Manor Tennis Courts
05/23/19 8422 11845 Storm Structural Repairs 2019
06/20/19 8421 11857 Hawk's Landing Flood Mitigation - Southwest
06/06/19 8420 11774 GLENWOOD CHILDRENS PARK STORM IMPRV
04/11/19 8396 8214556 2019 Parking Garage Maintenance
04/04/19 8391 17525 2019 Playground Replacements
02/28/19 8390 12264 CIPP Wet Lining Rehab of Sanitary Sewers - 2019
02/21/19 8386 19014 Forest Hill Cemtery Improvements 2019
03/21/19 8381 11227
02/07/19 8379 11808 Warning Sirens - 2019
12/20/18 8374 11446 RIMROCK INTRCPTR-INDUSTRIAL DR EXT
03/07/19 8370 11876 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2019
02/21/19 8369 11876 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2019
04/04/19 8368 11881 Sidewalk, Curb & Gutter, Citywide Installation and Repair 2019
02/21/19 8367 11880 Sidewalk Program 2019, Ald. District 9
03/07/19 8366 11879 Sidewalk Program 2019, Ald. District 1 & 7
10/24/19 8365 11166 Capitol Square Café Areas
06/20/19 8359 17395 Burr Jones Park - Site Improvements
07/02/20 8349 11739 E. Dayton Street Resurfacing w/Utilities
01/31/19 8348 19006 2019 Door Creek Park Tennis Courts Phase II
06/06/19 8328 11330 Olbrich Park Improvements
12/06/18 8327 11808 Warning Sirens - 2019
02/07/19 8325 11399 Spring Harbor Greenway at Masthead (Nautilus Pond Reconstruction)
02/28/19 8320 11856 Resurfacing 2019
02/28/19 8319 11856 Resurfacing 2019
02/28/19 8318 11856 Resurfacing 2019
04/25/24 8317 13893 Blue Harvest Lane, Feather Edge Drive, & Soaring Sky Run Assessment District – 2023
04/23/20 8316 10902 Vilas Ave and Campbell St Reconstruction
06/20/19 8315 11877 Local Road Traffic Calming & Arterial Ped Enhancements 2019
05/09/19 8314 11875 Bridge Repairs 2019
03/26/20 8313 11958 City View Drive (new street)
06/06/19 8312 11871 South Point Road Reconstruction
04/11/19 8311 11878 Pavement Crack Repair and Chip Seal 2019
04/11/19 8310 11878 Pavement Crack Repair and Chip Seal 2019
04/11/19 8309 11878 Pavement Crack Repair and Chip Seal 2019
04/11/19 8308 11878 Pavement Crack Repair and Chip Seal 2019
04/25/19 8307 11132 Park St Pavement Joint Repair (2019 inbound:2021 outbound)
03/19/20 8306 11744 Toepfer, Holly, Euclid and St. Clair Resurfacing w/Utilities
06/06/19 8305 11890 Davidson/Drexel/Lake Edge
03/26/20 8304 11889 E. Washington Avenue Permanent Pavement Marking Replacement-2020
Future Project 8303 11873 Belin Street and Park Way Reconstruction
05/23/19 8302 10900 Oak Street Reconstruction
02/28/19 8301 11963 Reetz Road & Altem Cir Storm w/Resurfacing
04/20/23 8300 11986 W. Wilson St, S. Broom St. & S. Henry St Resurfacing w/Utilities
06/20/19 8299 11987 N. Bassett Street Resurfacing w/Utilities
03/07/19 8298 11872 Groveland Terrace Reconstruction
02/07/19 8297 11452 Haywood Drive Reconstruction
02/07/19 8296 11944 E. Wilson, Williamson and S. Blount Street Reconstruction
10/24/19 8295 11182 Elizabeth St and N. Ingersoll St Reconstruction
03/05/20 8294 11865 Dairy Drive (new street)
06/20/19 8293 11985 New Sidewalk Installation 2019
01/10/19 8292 11753 Hammersley Avenue Reconstruction
10/11/18 8291 11982 Fainchild Building - Roof Replacement
01/24/19 8290 13115 Judge Doyle Podium
09/27/18 8289 11982 Fainchild Building - Roof Replacement
02/21/19 8288 10543 Parks Improvements
03/05/20 8287 12881 Olbrich Roof Replacements
04/25/19 8277 53W0896 Buckeye Road Reconstruction
04/25/19 8276 11761 DARBO DR CANOE LAUNCH 2019
09/20/18 8275 17133 Olbrich Park Maintenance Shed
09/20/18 8273 10524 McPike Park - Skatepark Seating Area
09/20/18 8268 10314 Jacobson-Furey Pond
10/25/18 8267 17384 Brittingham Dog Park Improvements
09/20/18 8258 11774 GLENWOOD CHILDRENS PARK STORM IMPRV
09/06/18 8255 11827 Sanitary Sewer Access Structure Lining - 2018
08/23/18 8250 10426 Sycamore Sanitary Sewer Interceptor Maintenance Access - Phase 1
09/20/18 8245 10954 Madison Police North District Flooring Replacement
10/25/18 8244 80007 Monona Terrace Airwall Replacement
09/09/21 8243 13278 Fire Station 10 - Roof Replacement
08/23/18 8240 10287 Demolition - Unit Well 3, 212 N First St
02/28/19 8238 11228 Metro 1101 Phase 1 Wash Bay
02/28/19 8238 11227
07/12/18 8232 11761 DARBO DR CANOE LAUNCH 2019
06/28/18 8229 11864 E. Washington Avenue Permanent Pavement Marking Replacement-2018
06/28/18 8228 17366 2018 Elver Park Inclusive Playground
06/28/18 8227 11867 CIPP Rehab of Sanitary Sewers - 2018
08/02/18 8225 17133 Olbrich Park Maintenance Shed
08/02/18 8224 10524 McPike Park - Skatepark Seating Area
08/02/18 8222 17158 Breese Stevens Field-Concession and Restroom Building
07/12/18 8221 20166 Monona Terrace
08/09/18 8220 17381
07/12/18 8216 45865 American Parkway-American Family Drive Traffic Signal
07/19/18 8213 10066 Neighborhood Centers
06/07/18 8212 11864 E. Washington Avenue Permanent Pavement Marking Replacement-2018
05/24/18 8194 17398 2018 Tennis and Basketball Court Resurfacings
05/24/18 8191 11743 Blackhawk/Heather Crest/Bruce Ct Resurfacing w/Utilities
05/03/18 8190 821455 2018 Parking Garage Maintenance
06/07/18 8186 10445 Old Sauk Road Water Pipeline (2018)
06/28/18 8184 11767 Westview Hills Sewer and Water Assessment District 2018
06/28/18 8182 17047 Public Health Office Remodel
08/02/18 8177 11330 Olbrich Park Improvements
04/12/18 8174 17304 2018 Parks Division Fencing and Backstops
05/24/18 8172 17370 2018 Park Playground Improvements - Group 2
05/24/18 8171 17158 Breese Stevens Field-Concession and Restroom Building
04/12/18 8164 17495 Park Paving 2018
07/12/18 8162 17193 Olbrich Botanical Expansion Ph 1
06/07/18 8161 11897 CIPP Rehabilitation of Water Mains - 2018
05/03/18 8160 17473 Gates of Heaven
04/12/18 8158 17502 Meadowood Park Sun Shelter Installation
04/05/18 8156 16124 2018 State Street Campus-Frances Parking Garage Electrical Modifications and Upgrade
03/15/18 8155 17398 2018 Tennis and Basketball Court Resurfacings
03/15/18 8154 17376 2018 Playground Replacements - Group 1
04/05/18 8153 821455 2018 Parking Garage Maintenance
02/22/18 8152 11653 Summit Maintenance Facility - Building Improvements
05/24/18 8151 17366 2018 Elver Park Inclusive Playground
01/25/18 8144 11562 WINGRA PARK SHORELINE
04/04/19 8143 12594 Madison Water Utility Olin Ave Vehicle Storage Roof Replacement
03/15/18 8128 45852 Maple Terrace/ University Ave Traffic Signal
06/28/18 8127 11754 Bikeways 2018
05/24/18 8126 11587 Local Road Traffic Calming & Arterial Ped Enhancements 2018
06/28/18 8125 11750 2018-New Sidewalk Installation
12/20/18 8124 11746 Darwin Rd Resurfacing w/Utilities
05/03/18 8123 11650 Glenview Dr and Joylynne Dr Reconstruction
05/24/18 8122 11181 Prospect(N) Avenue Reconstruction
03/05/20 8121 11677 Alleys: 1800&1900 Adams&Jefferson: 1800 Adams&Vilas: 1200&1300 Chandler&Vilas
05/24/18 8120 11783 Bridge Repairs 2018
02/28/19 8119 11185 S. Bryan/James/Thorp Reconstruction
02/28/19 8119 11749 STARKWEATHER SHORE REPAIR - DALEY DRIVE
04/19/18 8118 53W0752 W. Washington Avenue Pavement Replacement
04/12/18 8116 11180 Gilson Street Reconstruction
04/12/18 8116 10901 Pine Street Reconstruction
05/03/18 8114 11722 Frey St and Sawyer Ter Resurfacing w/Utilities
04/05/18 8111 11654 Utilities with Resurfacing 2018
03/21/19 8110 11676 Koster Street and Rusk Avenue
05/03/18 8109 11655 Davidson/Hegg/Major/Drexal/Lake Edge Reconstruction
03/22/18 8108 11745 Schenk St and Richard St Resurfacing w/Utilities
03/15/18 8107 11183 Emerson Street and Lowell Street Reconstruction
09/20/18 8106 11186 Winnebago St and Linden Ave Reconstruction
04/05/18 8105 11743 Blackhawk/Heather Crest/Bruce Ct Resurfacing w/Utilities
11/01/18 8104 11742 Shepard/Chamberlain/Van Hise/Mason Resurfacing w/Utilities
03/08/18 8103 11599 S. Livingston Street Reconstruction
02/08/18 8101 11294 Wingra Creek Pedestrian Bridge Replacement
02/22/18 8100 11674 Resurfacing 2018
02/22/18 8099 11674 Resurfacing 2018
02/22/18 8098 11674 Resurfacing 2018
06/28/18 8097 10185 Waste Oil Collection Sites
04/12/18 8095 11784 Pavement Crack Repair and Chip Seal 2018
04/12/18 8094 11784 Pavement Crack Repair and Chip Seal 2018
04/12/18 8093 11784 Pavement Crack Repair and Chip Seal 2018
04/12/18 8092 11784 Pavement Crack Repair and Chip Seal 2018
01/25/18 8088 10011 Monona Terrace Olin Terrace Rehabilitation
12/15/17 8085 17186 Olin Turville Park Boat Launch Improvements
04/05/18 8082 10452 Unit Well 12 Upgrade
03/15/18 8077 11772 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2018
04/05/18 8076 11772 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2018
04/12/18 8075 11771 Sidewalk, Curb & Gutter, Citywide Installation and Repair 2018
03/15/18 8074 11770 Sidewalk Program 2018, Ald. District 16
04/05/18 8073 11769 Sidewalk Program 2018, Ald. District 3
01/25/18 8072 11578 Fire Station 10 Bathroom Remodel
10/20/17 8065 53W1464 Madison Municipal Building (MMB)
12/15/17 8064 11226 Madison Metro Bus Garage- Roof Replacement
11/03/17 8063 17169 Garver Feed Mill Material Hauling
11/17/17 8062 17185 Vilas Park - Lagoon Bridge Replacements
11/03/17 8061 11591 Fire Station 10 Storefront Replacement
01/04/18 8058 11675 Westmorland Blvd Utilities w/Resurfacing
10/06/17 8053 10066 Neighborhood Centers
09/22/17 8047 53W1464 Madison Municipal Building (MMB)
09/08/17 8041 11728 CIPP Rehab of Large Diameter Storm Sewer
08/18/17 8035 11667 PARK EDGE DRIVE FLOOD MITIGATION
08/25/17 8033 11591 Fire Station 10 Storefront Replacement
08/18/17 8032 53W1787 OLIN TRANSFER STATION STORMWATER IMPROVEMENT
08/11/17 8030 20166 Monona Terrace
12/15/17 8027 17451 Fire Station 14 (2018) & Fire Station 14 Training Tower (2019)
07/07/17 8017 86001 Sheboygan Ave Water Main Replacement
07/07/17 8016 84024 Traffic Signal at Mineral Point and Yellowstone
06/16/17 8008 84024 Traffic Signal at Mineral Point and Yellowstone
08/25/17 8003 10524 McPike Park - Skatepark Seating Area
06/16/17 8002 17167 Forest Hill Cemetery Improvements 2017
09/22/17 8000 11649 E. Gilman St, N. Pinckney St and N. Bultler St Resurfacing w/Utilities
10/06/17 7999 11469 N. Hancock Street Reconstruction
07/21/17 7998 11591 Fire Station 10 Storefront Replacement
06/16/17 7980 10986 Corporate Drive Greenway
07/21/17 7979 10991 Monona Bay Shoreline Repairs
07/21/17 7978 20166 Monona Terrace
10/20/17 7976 11470 N. Blair Street Resurfacing wth Utlities
12/21/17 7974 53W1720 Monroe Street Reconstruction
07/07/17 7973 45826 Colony Dr & Gammon Rd
07/07/17 7970 17437 2017 Demetral Park Adult Fitness
06/16/17 7965 86003 CIPP Rehabilitation of Water Mains - 2017
06/16/17 7964 86001 Sheboygan Ave Water Main Replacement
07/11/19 7963 10435 Cannonball Water Main
06/16/17 7959 17317 Park Paving 2017
05/05/17 7957 11598 Blount Street Resurfacing
04/21/17 7956 11434 Resurfacing with Utilities 2017
08/04/17 7952 11471 Judge Doyle Garage(20017) Government East Ramp Demolition(2019)
08/11/17 7951 01627 Capitol East District Parking Structure
09/08/17 7950 11653 Summit Maintenance Facility - Building Improvements
04/21/17 7949 17434 Goodman Park Ice Rink Improvements
05/05/17 7948 17167 Forest Hill Cemetery Improvements 2017
04/12/17 7946 53W1464 Madison Municipal Building (MMB)
04/21/17 7945 17417 Monona Terrace Ped/Bike Path
04/26/17 7939 53W1464 Madison Municipal Building (MMB)
04/21/17 7936 10442 110 S. Paterson Street
04/07/17 7935 11590 Woods Road Resurfacing
03/15/17 7934 53W1464 Madison Municipal Building (MMB)
05/19/17 7933 17137 PENN PARK RESTROOM BUILDING
05/05/17 7930 10543 Parks Improvements
05/19/17 7929 17347 2017 Park Playground Improvements - Group 3
04/07/17 7928 17555 2017 Parking Garage Maintenance
04/07/17 7927 17440 2017 Brittingham Park Accessible Playground
04/07/17 7925 17343 2017 Park Plaground Improvements
03/24/17 7922 17434 Goodman Park Ice Rink Improvements
04/07/17 7917 17137 PENN PARK RESTROOM BUILDING
02/24/17 7913 10457 West Transfer Station - Pole Shed
02/24/17 7912 10457 West Transfer Station - Pole Shed
02/24/17 7911 10457 West Transfer Station - Pole Shed
03/24/17 7910 16126 State Street Capitol Garage Relighting and Electrical Controls and Upgrade
03/15/17 7906 11467 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2017
03/29/17 7905 11467 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2017
03/29/17 7904 11466 Sidewalk Program 2017, Ald. District 15
03/15/17 7903 11465 Sidewalk Program 2017, Ald. District 17
04/07/17 7902 11464 Sidewalk, Curb & Gutter, Citywide Installation and Repair 2017
07/08/21 7901 11515 Demetral Park Path Phase 2
03/29/17 7900 11463 Pavement Crack Repair and Chip Seal 2017
03/29/17 7899 11463 Pavement Crack Repair and Chip Seal 2017
03/29/17 7898 11463 Pavement Crack Repair and Chip Seal 2017
03/29/17 7897 11463 Pavement Crack Repair and Chip Seal 2017
08/11/17 7896 11571 2017-New Sidewalk Installation
05/05/17 7895 11491 Villager Mall Alley and Storm Relief
02/24/17 7889 10403 Overture Center Garage Elevator Modernization
02/10/17 7887 17315 2017 Parks Division Landscaping
02/10/17 7884 17075 Alicia Ashman Library
02/24/17 7880 10439 Lakeview Reservoir Landscaping
02/10/17 7879 17315 2017 Parks Division Landscaping
01/27/17 7877 10990 Warner Boat Launch Breakwater Reconstruction
11/18/16 7872 45300 Semi Permanent Epoxy Pavement Marking
02/10/17 7869 10001 Library Maintenance & Support Center Remodel
01/27/17 7866 17472 2017 Tennis and Basketball Court Resurfacing
12/16/16 7854 17434 Goodman Park Ice Rink Improvements
05/19/17 7852 11005 Streets East Paving
11/04/16 7851 11473 CIPP Rehab of Sanitary and Storm Sewers - 2016
04/21/17 7850 11435 Yuma Drive Resurfacing with Utilities
06/16/17 7849 11462 Local Road Traffic Calming & Arterial Ped Enhancements 2017
07/07/17 7848 11459 Wilson Street and Henry St Resurfacing with Utilities
05/19/17 7847 11430 N. Bassett, Conklin/Univ Alley & Henry/Broom Alley Reconstruction
02/17/17 7846 11438 Watts Road and Harvest Moon Lane
05/05/17 7845 11437 S. Stoughton Rd Service Rd,Remington Rd & Blossom Ln
02/08/18 7843 11461 Ronald Reagan Ave, John Wall Dr and Merchant St
01/27/17 7842 10898 Grand Ave, Van Hise, Park Pl and Mason St Reconstruction
04/29/21 7838 11432 Dean Ave, Allis Ave, Tyler Cir & Seth Cir
02/24/17 7837 11103 Langdon Street Resurfacing and Streetscape
04/21/17 7836 11433 Douglas, Lamont, Acacia, Louden, Kvamme
02/10/17 7835 10899 Gregory/Knickerbocker/Sprague/Sheldon Reconstruction
10/21/16 7834 10800 CIPP Wet Lining Rehab of Sanitary Sewer - 2016
11/18/16 7823 10442 110 S. Paterson Street
01/27/17 7821 10445 Old Sauk Road Water Pipeline (2018)
11/04/16 7820 11489 Citywide Median Planting 2017
11/04/16 7819 10250 Cottage Grove Road Median Planting 2017
11/04/16 7818 11488 Traffic Calming Medians Landscaping 2017
10/07/16 7816 10461 Demolition - 217 N. First St.
11/04/16 7815 10848 Wheeler at Bonner - Cherokee Pond
03/24/17 7813 11431 Sunset Courts (East, West, North & South)
10/07/16 7806 17140 Esther Beach Park Phase II Improvements
12/16/16 7803 11429 Capital Square Pavement Replacement Phase 2
10/30/25 7802 53W1791 Capital City Path – Segment 5-6
06/16/17 7801 10154 Capital City Path – Segment 1
05/05/17 7800 11468 Bridge Maintenance and Repairs 2017
07/21/17 7799 11460 Bike Paths 2017
03/24/17 7798 11434 Resurfacing with Utilities 2017
02/10/17 7797 11369 Resurfacing 2017
02/10/17 7796 11369 Resurfacing 2017
02/10/17 7795 11369 Resurfacing 2017
10/07/16 7792 10617 Bowman Baseball Backstop Replacement
08/12/16 7784 11363 Olbrich Gardens Solar Hot Water System Installation
08/12/16 7782 10121 Esther Beach Park Shelter
07/22/16 7780 11400 Williamson Street Bridge Repair-2016
12/02/16 7776 11001 Wash Bay
09/09/16 7774 10457 West Transfer Station - Pole Shed
09/09/16 7773 45019 Public Safety Radio System 2016
07/11/19 7769 11314 Sycamore Ave Public Works Maintenance Facility – Office Remodel
08/26/16 7767 10488 Goodman Park Maintenance Storage Building D
07/01/16 7763 11400 Williamson Street Bridge Repair-2016
07/01/16 7761 53W1865 Forest Hill Mausoleum-Building Envelope Repairs
09/09/16 7760 10305 Fleet Service Relocation
08/05/16 7758 10952 Police Department West District
08/05/16 7757 11366 Fire Station 9 Roof Replacement
06/24/16 7756 10290 CIPP Rehab of Large Diameter Sanitary and Storm Sewer
07/01/16 7755 B000127 Metro Transit Repair and Refurbish Underground Diesel Fuel Storage Tanks
08/05/16 7754 10305 Fleet Service Relocation
01/20/17 7751 53W1464 Madison Municipal Building (MMB)
08/26/16 7750 53W1464 Madison Municipal Building (MMB)
06/10/16 7748 10800 CIPP Wet Lining Rehab of Sanitary Sewer - 2016
06/10/16 7747 10876 SOUTH POINT YARD WASTE SITE AND DRIVEWAY REPAVING
06/03/16 7745 B000127 Metro Transit Repair and Refurbish Underground Diesel Fuel Storage Tanks
06/03/16 7740 17435 2016 Garner Park Tennis to Pickleball - Court Conversion
07/08/16 7739 17143 Brittingham Park Sidewalk Improvements
05/20/16 7737 10914 Monona Terrace
05/06/16 7735 12095 Madison Water Utility-SCADA Room Renovation
08/05/16 7730 20170 Monona Terrace Fire Alarm System Upgrade
06/10/16 7729 86100 Repaint Madison Water Utility Reservoirs 9, 115, and 315
04/13/16 7728 17423 2016 Parks Sun Shelters Installation
06/16/17 7726 53W1832 Midtown Police District Station
04/22/16 7722 53W1864 MATC NORTH DITCH RESTORATION
04/27/16 7716 17456 2016 Parking Garage Maintenance
04/08/16 7715 12095 Madison Water Utility-SCADA Room Renovation
03/30/16 7713 10800 CIPP Wet Lining Rehab of Sanitary Sewer - 2016
05/06/16 7711 174295 Park Paving - 2016
03/25/16 7710 53W1734 Willow Creek Treatment System
03/25/16 7709 17422 2016 Fall Parks Division and Water Utility Landscaping
03/09/16 7698 11104 Sidewalk Program 2016, Ald. District 2
07/08/16 7696 11363 Olbrich Gardens Solar Hot Water System Installation
04/08/16 7695 17439 2016 Park Playground Improvements- Group 2
05/06/16 7693 17441 2016 Park Playground Improvements - Group 3
02/24/17 7692 17449 Packers Ave/Darwin Rd Intersection
06/16/17 7690 11351 Monona Bay Weed Cutter Dredging
03/09/16 7685 53W1386 Engineering Operations Building Addition
03/25/16 7675 10430 CIPP Rehabilitation of Water Mains - 2016
03/04/16 7674 17422 2016 Fall Parks Division and Water Utility Landscaping
05/06/16 7673 11212 E. Broadway Service Rd Water Main Replacement
06/10/16 7670 11301 Pleasant View and Blackhawk Rd Intersection Improvement
03/04/16 7669 17422 2016 Fall Parks Division and Water Utility Landscaping
04/01/16 7668 17423 2016 Parks Sun Shelters Installation
06/10/16 7666 11306 N. Segoe Road Water Main Replacement
03/04/16 7664 17438 2016 Park Playground Improvements - Group 1
03/04/16 7663 11107 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2016
02/07/19 7662 10002 Pinney Library
05/06/16 7660 17435 2016 Garner Park Tennis to Pickleball - Court Conversion
03/25/16 7659 11123 Bridge Maintenance and Repairs 2016
02/19/16 7647 10617 Bowman Baseball Backstop Replacement
03/30/16 7644 11300 New Sidewalk Installation 2016
06/01/16 7643 11211 Bedford Street and MATC Pipe Bursting
11/04/16 7641 10906 Woodrow Street Reconstruction
04/08/16 7640 10904 Turner Ave and Allis Ave
03/25/16 7639 11106 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2016
03/04/16 7638 11105 Sidewalk Program 2016, Ald. District 6
02/19/16 7637 11104 Sidewalk Program 2016, Ald. District 2
06/24/16 7636 10217 Sherman Avenue (North)
03/09/16 7634 10507 Pavement Crack Repair and Chip Seal-2016
03/09/16 7633 10507 Pavement Crack Repair and Chip Seal-2016
03/25/16 7632 10507 Pavement Crack Repair and Chip Seal-2016
03/25/16 7631 10507 Pavement Crack Repair and Chip Seal-2016
05/20/16 7630 11126 Local Road Traffic Calming & Arterial Ped Enhancements-2016
02/19/16 7628 11107 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2016
02/05/16 7627 11091 Hillcrest Dr & Hillcrest Circle
04/27/16 7626 11095 Fordem Aveune Utility Replacement w/Resurfacing
03/30/16 7625 11099 Cottage Grove Road Resurfacing
06/16/17 7624 10429 City View Drive (new street)
02/19/16 7623 10903 Capital Square Pavement Replacement Phase 1
02/05/16 7621 10895 2016 Resurfacing
01/22/16 7618 17430 2016 Tennis and Basketball Court Resurfacings
02/05/16 7616 10895 2016 Resurfacing
02/05/16 7615 10895 2016 Resurfacing
01/22/16 7614 53W1503 McKenna Boulevard/S. Gammon Road
02/21/19 7613 11094 Portage Road
02/21/19 7613 53W0916 Eastlawn Plat Multi-Use Path Bridge
02/21/19 7613 11785 Portage to Eastpark Path
03/25/16 7612 10893 S. Park Street Sanitary Replacement
02/05/16 7611 11097 2016 Utilities with Resurfacing
11/13/15 7610 10526 Tree Plantings
11/13/15 7609 10526 Tree Plantings
11/06/15 7598 17453 2016 Street Tree Replacement
10/09/15 7585 10394 2015 Parking Garage Maintenance
11/04/16 7584 10896 Sargent St and Walter St Resurfacing w/Utilities
10/23/15 7580 10526 Tree Plantings
10/23/15 7579 10526 Tree Plantings
10/09/15 7570 17453 2016 Street Tree Replacement
11/06/15 7565 10914 Monona Terrace
02/10/17 7564 10001 Library Maintenance & Support Center Remodel
08/21/15 7563 53W1854 Arboretum Screen Structure Repair
08/07/15 7558 11176 Felland Road Resurfacing
08/07/15 7557 53W1788 STREETS EAST STORMWATER IMPROVEMENT
07/24/15 7554 53W1932 CIPP Rehab of Sanitary and Storm Sewers 2015
08/21/15 7545 10394 2015 Parking Garage Maintenance
08/07/15 7544 10468 Warner Park Basketball Court Lighting
09/04/15 7541 10526 Tree Plantings
06/19/15 7539 53W1118 High Point Road Confluence Pond Regrading
06/19/15 7538 53W1800 Nakoma Greenway Repair
08/05/16 7532 53W1690 5200 Camden flood purchase
06/05/15 7531 53W1831 Lake Edge Park Shelter
07/10/15 7529 10442 110 S. Paterson Street
03/21/19 7528 10305 Fleet Service Relocation
07/10/15 7526 10486 Owl Creek Park Development-Phase2
04/24/15 7517 53W1892 Carpeting at South District Police Station
09/04/15 7515 10463 Tenney Lagoon Shoreline Native Vegetation Installation and Maintenance
04/10/15 7506 53W1855 Anderson Street Sanitary Lining Repair
05/08/15 7505 10309 Landscape Restoration 2015
03/27/15 7503 53W1916 2015 Spring Parks Division & Water Utility Landscaping
03/27/15 7501 53W1892 Carpeting at South District Police Station
01/13/17 7500 10434 Unit Well 31 Reservoir and Facility Construction
04/17/15 7499 10434 Unit Well 31 Reservoir and Facility Construction
10/06/17 7498 10452 Unit Well 12 Upgrade
03/27/15 7496 10394 2015 Parking Garage Maintenance
03/06/15 7495 53W1532 Brittingham Park Path and Boat Launch Reconfiguration-2015
03/20/15 7493 10632 2015 Park Playgrounds - Group 2 - Sunridge Park
03/20/15 7493 10640 2015 Park Playgrounds - Group 2 - Demetral
03/20/15 7493 10631 2015 Park Playgrounds - Group 2 - Tenney Park
03/20/15 7493 10645 2015 Park Playgrounds - Group 2 - Arbor Hills Park
03/20/15 7493 10643 2015 Park Playgrounds - Group 2 - Bernies Beach Park
03/20/15 7493 10637 2015 Park Playgrounds - Group 2 - Junction Ridge Park
05/08/15 7490 53W1930 Burning Wood/Comanche Way and Fourth Street Util w/Resurfacing
03/20/15 7488 53W1928 2015 Dog Park Improvements
03/06/15 7487 53W1927 Structural Rehabilitation of Water Mains - 2015
03/20/15 7484 53W1929 2015 Street Tree Replacement
04/24/15 7478 53W1922 Forest Hill Cemetery- John Catlin Chapel Roof Replacement
03/27/15 7475 53W1919 Quann Park Tennis Courts - Phase 2
02/20/15 7473 53W1918 2015 Park Playgrounds - Group 1
03/06/15 7471 53W1917 2015 Parks Division Tree Planting
03/06/15 7470 53W1916 2015 Spring Parks Division & Water Utility Landscaping
02/20/15 7466 53W1915 Highland Manor Park Improvements
03/06/15 7465 53W1914 Park Paving - 2015
06/10/16 7464 53W1911 Demetral Park Path
03/09/16 7462 53W1681 Cottage Grove Rd and Dempsey Improvements
03/06/15 7459 53W1772 Yahara Hills Facility Improvements
03/27/15 7458 53W1772 Yahara Hills Facility Improvements
01/27/17 7457 53W1910 Whitney Way Water Pipeline
02/20/15 7456 53W1908 2015 Tennis and Basketball Court Resurfacing
01/07/15 7454 53W1434 Fire Station Administration Office Building and Fire Station #1 - (Hovde Properties Tenant Improvements)
04/07/17 7452 53W1903 Lakeview Reservoir Pipeline Improvements, Phase 2
04/10/15 7451 53W1836 Center Ave and Sommers Ave Reconstruction
05/24/18 7450 53W1867 Darbo Drive to Webb Avenue New Street Connection Assessment District - 2018 (Richard Davis Lane)
05/22/15 7449 53W1899 Bridge Maintenance and Repairs 2015
06/05/15 7448 53W1515 Wirth Court Reconstruction
Future Project 7447 53W1061 Hermina and Union Street Reconstruction
05/08/15 7446 53W1887 Marsh Road Resurfacing
06/19/15 7445 53W1510 Spruce St Reconstruction
05/08/15 7444 53W1882 Local Road Traffic Calming & Arterial Ped Enhancements-2015
05/08/15 7443 53W1876 Cross Street
05/22/15 7442 53W1844 Turner Avenue
05/22/15 7441 53W1842 Hoepker Road
04/24/15 7439 53W1506 Potter Street Reconstruction
Future Project 7438 13305 Nakoma Road Sidewalk
04/01/15 7437 53W1793 Utilities with Resurfacing 2015
04/01/15 7435 53W1845 Larkin, Glenway, Hillcrest, Zwerg, Ross Resurfacing w/Utilities
03/27/15 7434 53W1843 Hanson Road
05/22/15 7433 53W1753 State Street Sidewalk Repairs-2015
03/27/15 7432 53W1839 American Pkwy/Eastpark Blvd & American Pkwy/Buttonwood Dr
05/22/25 7431 53W1834 Cannonball Path Phase 6
04/22/16 7430 53W1890 N LAKE STREET RESURFACING ASSESSMENT DISTRICT – 2016
05/22/15 7429 53W1901 Sprecher Road, Commercial Ave Intersection
03/27/15 7428 53W1847 Adams, S. Randall and Mound Resurfacing w/Utilities
03/06/15 7427 53W1885 Repairing & Sealing Pavement Cracks, Major Streets - 2015
03/06/15 7426 53W1884 Repairing & Sealing Pavement Cracks, Local Streets - 2015
03/06/15 7425 53W1881 Chip Seal 2015-West
03/06/15 7424 53W1880 Chip Seal 2015-East
03/20/15 7423 53W1846 N Pinckney St Resurfacing w/Utilities
02/06/15 7421 53W1898 City Wide Street & Storm Upgrade and Repairs
02/06/15 7419 53W1856 S. Owen Drive Assessment District - 2015
02/06/15 7418 53W1837 Tompkins Drive Assessment District - 2015
12/19/14 7417 53W1053 Bascom Pl/Bascom St/Chamberlain Ave Reconstruction
04/10/15 7416 53W1826 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2015
02/20/15 7414 53W1886 Resurfacing 2015
02/20/15 7413 53W1886 Resurfacing 2015
02/20/15 7412 53W1886 Resurfacing 2015
01/09/15 7411 53W1896 Booster Pump Station 115 Upgrade
12/19/14 7409 53W1892 Carpeting at South District Police Station
12/12/14 7408 53W1785 Skatepark - Central Park, Madison
04/08/16 7407 53W1507 Jenifer, Paterson & Brearly St Reconstruction & Few St(resurfacing)
09/26/14 7401 53W1735 Olbrich Park Canoe Launch
Future Project 7399 53W1874 Metro Roof Phase 1 of 2
08/05/16 7398 53W1832 Midtown Police District Station
05/08/15 7395 53W1511 Madison St Reconstruction & Oakland Ave(resurface)&Alley
05/08/15 7392 53W1866 Nakoma Park Pedestrian Entrance Steps-Masonry Repairs
06/10/16 7391 53W1865 Forest Hill Mausoleum-Building Envelope Repairs
02/06/15 7389 53W1250 Old Middleton/Eau Claire Intersection and Good Neighbor Trail
05/22/15 7386 53W1820 Tenney Lagoon Shoreline Restoration
09/05/14 7385 53W1808 Theresa Terrace Neighborhood Center
03/27/15 7383 53W1440 HVAC Upgrade for Olbrich Botanical Gardens-Phase 1
12/19/14 7381 53W1792 Johns Street and Emil Street Utilities with Resurfacing
07/25/14 7369 53W1663 Eastmorland Park Greenway & Pond
02/06/15 7367 53W1828 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2015
02/20/15 7366 53W1828 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2015
03/27/15 7365 53W1826 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2015
02/06/15 7364 53W1825 Sidewalk Program-2015
03/06/15 7363 53W1825 Sidewalk Program-2015
08/08/14 7362 53W1795 2014 Playground Improvements- Group 2
07/11/14 7356 53W1775 Bittersweet Place
08/22/14 7354 53W1819 Lakeview Reservoir Pipeline Improvements
08/22/14 7352 53W1818 Aldo Leopold Park Shelter Installation
06/27/14 7351 53W1676 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2014
08/08/14 7350 53W1815 Bowman Lighting System - Phase Two
08/08/14 7349 53W1814 East Washington Ave Median Replanting-2014
08/08/14 7348 53W1814 East Washington Ave Median Replanting-2014
08/05/16 7347 53W1813 Fire Station #3 Roof Replacement
07/02/14 7343 53W1625 Highland Manor Storm Shelter (Site Grading Component)
06/20/14 7341 53W1645 CIPP Rehab of Sanitary and Storm Sewers 2014
08/22/14 7339 53W1809 Lakeview Reservoir Reconstruction
08/08/14 7335 53W1808 Theresa Terrace Neighborhood Center
06/20/14 7334 53W1806 Fire Station #5 Roof Door and Hose Tower Repairs
08/12/16 7330 53W1734 Willow Creek Treatment System
09/26/14 7327 53W1617 Dunns Marsh Treatment Structure
07/11/14 7325 53W1801 Brittingham Park Paving Improvements
07/02/14 7321 53W1797 Structural Rehabilitation of Water Mains - 2014 West
06/27/14 7320 53W1796 Structural Rehabilitation of Water Mains - 2014 East
06/06/14 7319 53W1625 Highland Manor Storm Shelter (Site Grading Component)
06/20/14 7318 53W1795 2014 Playground Improvements- Group 2
06/20/14 7317 53W1622 Morrison Court Reconstruction
06/06/14 7312 53W1785 Skatepark - Central Park, Madison
09/11/15 7311 53W1756 CCB City Channel and Shared Resource Planning Remodel
09/11/15 7311 10644 2015 Park Playgrounds - Group 2 - Badger Park
04/25/14 7307 53W1625 Highland Manor Storm Shelter (Site Grading Component)
06/01/14 7303 53W0740 Johnson Street, East Reconstruction
04/04/14 7302 53W1742 2014 Park Division, Parking & Water Utility Landscaping
04/04/14 7301 53W1742 2014 Park Division, Parking & Water Utility Landscaping
04/04/14 7300 53W1742 2014 Park Division, Parking & Water Utility Landscaping
05/06/16 7292 53W1773 Lower Badger Mill Sanitary Sewer Interceptor Phase 3
08/08/14 7291 53W1299 Lower Badger Mill Sanitary Sewer Interceptor Phase - 2
07/25/14 7286 53W1772 Yahara Hills Facility Improvements
03/28/14 7284 53W1767 2014 Playground Improvements- Group 1
04/11/14 7283 53W1766 2014 Parking Garage Maintenance
03/28/14 7281 53W1532 Brittingham Park Path and Boat Launch Reconfiguration-2015
02/21/14 7280 53W1667 Boulevard Landscaping - 2013
05/23/14 7277 53W1762 Park Paving - 2014
03/28/14 7276 53W1588 Near West Sanitary Sewer Relocation Assessment District - 2014
04/11/14 7275 53W1761 Landscape Restoration 2014
05/23/14 7274 53W1757 Breese Stevens Field Synthetic Turf - 2014
02/21/14 7272 53W1667 Boulevard Landscaping - 2013
02/06/15 7270 53W1750 Hwy 151/Lancaster Dr Water Main Crossing
Future Project 7269 53W1749 Dairy Drive MFD Training Exercise Building
03/07/14 7266 53W1747 Tenney Park Concrete Bridge Historic Restoration-2014
03/28/14 7265 53W1743 Unit Well 7 Reconstruction and Filter Addition
02/21/14 7264 53W1742 2014 Park Division, Parking & Water Utility Landscaping
04/11/14 7260 53W1740 2014-2016 Semi-Permanent (Epoxy) Pavement markings
02/21/14 7259 53W1626 Elver and Reindahl Park Splash Pads
02/21/14 7255 53W1678 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2014
09/26/14 7254 53W1712 John Nolen Path Reconstruction
06/27/14 7252 53W1718 Local Road Traffic Calming & Arterial Ped Enhancements-2014
06/06/14 7251 53W1290 South Point Road
05/09/14 7250 53W0606 Clemons, Helena, Walton, Jenifer Reconstruction
03/28/14 7248 53W1056 North St, Hoard St and Commercial Ave Reconstruction
04/11/14 7247 53W1052 Adams Street Reconstruction
03/28/14 7246 53W1360 Langdon Street Streetscape 2014 & N. Hamilton Street
03/28/14 7246 53W1198 Johnson and Henry Street Terrace Reconstruction
04/24/15 7245 53W1704 Capital City Path Reconstruction and Bridge Replacement
03/07/14 7244 53W1672 Utility Replacement with Resurfacing - 2014
03/07/14 7243 53W1721 Henry Street, N. Reconstruction
03/07/14 7243 53W1731 Mifflin(West) Street Utilities with Resurfacing
04/11/14 7242 53W1717 Repairing & Sealing Pavement Cracks, Major Streets-2014
04/11/14 7241 53W1716 Repairing & Sealing Pavement Cracks, Local Streets - 2014
02/21/14 7240 53W1715 Chip Sealing 2014-West
02/21/14 7239 53W1714 Chip Sealing 2014-East
06/20/14 7238 53W1547 Cannonball Path Phase 5
06/10/16 7236 53W0861 Ice Age Junction Path & E. Mendota-Pheasant Branch Greenway
05/09/14 7235 53W1730 Packers Avenue Sidewalk at Lakeland College
04/11/14 7234 53W0615 Commonwealth/Fox/Gregory Reconstruction
03/28/14 7233 53W1699 Resurfacing 2014
03/28/14 7232 53W1699 Resurfacing 2014
06/27/14 7230 53W1727 High Street
05/23/14 7229 53W1705 Alley Reconstruction, Block 2 Wingra Park
06/20/14 7228 53W1583 Alley Reconstruction, Block 11 Bowens addition
06/05/15 7227 53W1683 Bear Claw Way, Wilrich St and Cobalt St (new streets)
06/27/14 7226 53W1338 Elderberry Road (new street)
06/27/14 7224 53W1726 Cross Oak Drive (new street)
01/24/14 7223 53W1725 Goodman Topsoil Shed
05/09/14 7221 53W1699 Resurfacing 2014
02/07/14 7220 53W1699 Resurfacing 2014
01/24/14 7219 53W1699 Resurfacing 2014
01/24/14 7218 53W1699 Resurfacing 2014
01/24/14 7217 53W1590 King Street and E. Main Street Reconstruction
02/07/14 7215 53W1710 Tennis/Basketball Court Resurfacing - 2014
02/07/14 7211 53W1709 West Badger Rd and Lancaster Dr Water Main Replacement
03/26/14 7206 53W1193 State Street Mall Reconstruction
12/06/13 7203 53W1645 CIPP Rehab of Sanitary and Storm Sewers 2014
01/10/14 7202 53W1631 Meadowridge Branch Library/Meadowood Neighborhood Center Remodeling
08/22/14 7200 53W1696 Warner Park Cunette Replacement
10/04/13 7194 53W1183 Own Park Drainage Channel Stabilization-2013
10/04/13 7191 53W1619 Monona Terrace Maintenance Projects-2013
01/09/15 7188 53W1693 Booster Station 115 Pipeline Improvements
10/04/13 7185 53W1685 Well 24 - Roof Repairs
09/06/13 7182 53W1183 Own Park Drainage Channel Stabilization-2013
09/06/13 7181 53W1619 Monona Terrace Maintenance Projects-2013
09/06/13 7180 53W1619 Monona Terrace Maintenance Projects-2013
08/23/13 7177 53W1196 Reiner Road Resurfacing
02/07/14 7176 53W1678 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2014
03/07/14 7175 53W1676 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2014
02/21/14 7174 53W1675 Sidewalk Program-2014
02/07/14 7173 53W1675 Sidewalk Program-2014
09/20/13 7172 53W1671 Traffic Engineering Electrical Upgrades-2013
08/09/13 7170 53W1648 Unit Well 26 Reservoir Repairs
08/16/13 7169 53W1165 South Point Road Public Works Storage Building
11/08/13 7167 53W1667 Boulevard Landscaping - 2013
07/26/13 7161 53W1567 Streets West, Cold Storage Roof Replacement
08/23/13 7158 53W1644 CIPP Rehab of Sanitary and Storm Sewers 2013 - Phase 1
09/06/13 7154 53W1593 Breese Stevens Field Lighting/Sound System Improvements
07/12/13 7153 53W1643 Garner Park Masonry Repairs-2013
08/09/13 7150 53W1661 Hoyt Park Fence Replacement
07/26/13 7137 53W1657 Basketball Court Reconstruction ‘13
08/09/13 7136 53W1655 Blackhawk Park Shelter Installation
08/09/13 7135 53W1656 Bowman Lighting Distribution System
08/23/13 7134 53W1649 City-County Building GR-10 Reception Windows Replacement
07/12/13 7132 53W1648 Unit Well 26 Reservoir Repairs
08/02/13 7131 53W1600 Post Watford Pond Remediation
07/12/13 7130 53W1647 2013 Park Playground Improvements
06/21/13 7124 53W1639 CIPP Rehabilitation of Water Mains - 2013
04/04/14 7123 53W1152 Fire Station #13
06/21/13 7117 53W1579 Badger Rock Path
05/10/13 7114 53W1634 Femrite Drive Resurfacing
11/08/13 7107 53W1633 Unit Well 26 Generator Addition
05/10/13 7106 53W1630 Brayton Lot Repairs
03/28/14 7104 53W1449 Tornado Shelter Project
03/28/14 7104 53W1625 Highland Manor Storm Shelter (Site Grading Component)
06/07/13 7101 53W1629 Booster Pumping Station 106 Reconstruction
08/09/13 7100 53W1628 Park Paving - 2013
08/09/13 7084 53W1619 Monona Terrace Maintenance Projects-2013
08/09/13 7083 53W1619 Monona Terrace Maintenance Projects-2013
08/09/13 7082 53W1619 Monona Terrace Maintenance Projects-2013
08/09/13 7081 53W1619 Monona Terrace Maintenance Projects-2013
08/09/13 7080 53W1619 Monona Terrace Maintenance Projects-2013
08/09/13 7079 53W1619 Monona Terrace Maintenance Projects-2013
08/09/13 7078 53W1619 Monona Terrace Maintenance Projects-2013
03/28/14 7077 53W1618 Streets East Tile Floor Replacement
05/03/13 7071 53W1615 Highland Ave Water Main Replacement
04/05/13 7069 53W1611 2013 Parking Garage Maintenance
05/03/13 7066 53W1608 Tenney Park Lagoon Outlet Gate
04/26/13 7062 53W1591 Rain Garden & Median Planting 2013
02/22/13 7061 53W1428 Don Miller Site Remediation
05/22/15 7059 53W1604 Central Park Phase 1B
06/21/13 7053 53W1552 Wolfe Addition to Hawks Creek
06/07/13 7051 53W1599 Madison Water Utility Unit Well 31 - Drill Well
02/22/13 7048 53W1580 Water Replacement with Resurfacing
06/21/13 7047 53W1597 Rennebohm Park Tennis Court Lighting
05/24/13 7045 53W1595 Upgrade Booster Pumps at Unit Well 20
06/07/13 7044 53W1593 Breese Stevens Field Lighting/Sound System Improvements
04/26/13 7043 53W1592 Breese Stevens Field Concrete Deck Repairs
04/26/13 7042 53W1589 Walter Street and Johns Street Resurfacing
03/22/13 7035 53W1495 Sidewalk Program-2013
04/26/13 7034 53W1577 MPD Training Center Parking Lot Expansion-Phase 2
02/22/13 7032 53W1575 Warner Boat Launch Dredging 2012
04/26/13 7030 53W1573 Forest Hill Cemetery- Masonry Repairs to the Receiving Vault & Chapel, Roof Replacement for the Chappel
03/01/13 7029 53W1572 Tennis Court Resurfacing-2013
02/15/13 7028 53W1570 2013 Park and Water Utility Landscape and Maintenance Contractor
05/03/13 7027 53W1569 Fleet Services Roof Replacement
07/12/13 7026 53W1568 Traffic Engineering-Building C Roof Replacement
06/07/13 7025 53W1567 Streets West, Cold Storage Roof Replacement
03/22/13 7021 53W1492 Resurfacing 2013
03/22/13 7020 53W1492 Resurfacing 2013
06/21/13 7019 53W1560 Evan Acres Road
03/22/13 7016 53W1553 Cherokee Drive Utilities with Resurfacing
05/10/13 7015 53W1555 Wheeler Rd, Delaware Blvd & Northland Dr Resurfacing
02/22/13 7011 53W1194 Webster Street Reconstruction
12/07/12 7010 53W1551 Atwood Avenue / Dunning Street Bike Crossing
02/22/13 7009 53W1399 University Relief Storm Phase 4
07/12/13 7008 53W0853 Central Park - Phase I
06/21/13 7007 53W1538 World Dairy Campus Replat
02/22/13 7006 53W1445 W. Wilson Street Reconstruction
05/10/13 7005 53W1475 W. Johnson Street Curb and Terrace Repair 2013
02/22/13 7004 53W1496 Utility Replacement with Resurfacing - 2013 (Clymer Pl Vacation)
09/20/13 7003 53W1476 University Avenue Landscaping
05/09/14 7002 53W1332 Stoughton Road/Voges Road Intersection
04/05/13 7001 53W1491 Repairing & Sealing Pavement Cracks, Major Streets-2013
04/05/13 7000 53W1490 Repairing & Sealing Pavement Cracks, Local Streets - 2013
03/07/14 6999 53W1544 Oakridge/Ohio/Miller Resurfacing
04/26/13 6998 53W1483 N. Henry Street and Iota Court Reconstruction
04/10/15 6997 53W1047 N. Charter St and Spring St Reconstruction
02/08/13 6996 53W0618 Mound Street Reconstruction
06/07/13 6995 53W1489 Local Road Traffic Calming & Arterial Ped Enhancements-2013
01/11/13 6994 53W1462 Livingston Street Resurfacing with Utilities
03/28/14 6993 53W1543 Kendall/Prospect/Lathrop Resurfacing
03/22/13 6992 53W1356 Dayton Street (East) & N. Brearly St Reconstruction
07/12/13 6991 53W1477 Cottage Grove Road Resurfacing
04/05/13 6990 53W1482 Chip Sealing 2013-West
04/05/13 6989 53W1481 Chip Sealing 2013-East
01/10/14 6988 53W1535 John Nolen Bridge Repair 2014
04/19/13 6987 53W1478 Merrill Crest Drive
06/07/13 6986 53W1546 John Nolen Drive/North Shore Drive intersection
05/24/13 6985 53W1480 Warner Park Paths
01/25/13 6984 53W1484 N. Thornton Avenue Reconstruction
08/22/14 6983 53W1537 Royster Clark Development
05/24/13 6981 53W1534 Keyes Avenue Reconstruction
05/24/13 6980 53W1542 Brentwood/Monterey/Trailsway/Wyldewood Resurfacing
02/22/13 6979 53W1545 Washington Avenue (East) Landscaping
04/05/13 6978 53W1495 Sidewalk Program-2013
02/22/13 6977 53W1494 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2013
02/22/13 6976 53W1488 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2013
03/22/13 6971 53W1522 Storm Sewer with Resurfacing 2013
03/22/13 6971 53W1492 Resurfacing 2013
02/08/13 6970 53W1492 Resurfacing 2013
01/25/13 6969 53W1492 Resurfacing 2013
01/25/13 6968 53W1492 Resurfacing 2013
01/25/13 6967 53W1492 Resurfacing 2013
10/05/12 6965 53W1498 Madison Municipal Building- Electrical Panel Upgrade
07/12/13 6962 53W1165 South Point Road Public Works Storage Building
10/05/12 6961 53W1326 N. Franklin - N. Blair Street Sanitary Crossover
11/02/12 6959 53W1424 Midvale Median Landscaping
10/12/12 6957 53W1528 Truman Olson US Army Reserve Center
09/21/12 6950 53W1473 Boulevard Landscaping-2012
08/10/12 6948 53W1453 City View Drive Water Main
10/12/12 6946 53W1523 West Streets Lighting Retrofit - 2013
09/14/12 6944 53W1302 Park Street Pedestrian Bridge Repair
08/31/12 6942 53W1065 Warner Lagoon Outlet Culvert Repair
09/07/12 6941 53W1521 Well 15 VOC Air Stripper
07/25/12 6939 53W1520 Central Library Sanitary Sewer Lateral
07/20/12 6938 53W1519 BLAIR STREET SANITARY SEWER REPAIR 2012
08/03/12 6936 53W1497 Fire Sprinkler Installation at Fire Station #4
08/24/12 6935 53W1116 Sauk Creek Sewer Access Road, Phase 2
08/17/12 6934 53W1487 Segoe Road Water Main
08/17/12 6931 53W1486 600 Block West Badger Road Water Main
08/17/12 6926 53W1471 Park Street, Fish Hatchery Intersection Improvments
08/10/12 6925 53W1470 Commercial Avenue Service Road Railroad Crossing
08/17/12 6924 53W1469 Madison Police West District Paint and Wall Covering Replacement
07/13/12 6923 53W1468 Professional Drilling Services Associated with the Installation of a Groundwater Monitoring (Sentry) Well – Unit Well #8 / Elmside Circle Park Area.
08/31/12 6922 53W1467 Syene Road
07/13/12 6919 53W1463 CIPP REHABILITATION OF WATER MAINS - 2012
06/08/12 6918 53W1441 Don Miller & Schappe Building Demolitions
08/03/12 6912 53W1141 Eastlawn Greenway Repair
05/03/13 6907 53W1452 Paint Cross Hill Drive Water Tower
12/28/12 6906 53W1409 E. Washington Ave and Livingston St Intersection Improvement
05/25/12 6903 53W1448 Conklin Place Sanitary Sewer and Watermain Replacement
02/22/13 6902 53W1447 Olbrich Gardens Restroom Addition
07/20/12 6901 53W1446 Tenney Park Tennis Court Lighting
07/13/12 6900 53W1101 Cherokee Marsh Stormwater Management Ponds
06/29/12 6899 53W1453 City View Drive Water Main
05/04/12 6893 53W1436 Install Direct Gas HVAC Units
02/06/15 6891 53W1434 Fire Station Administration Office Building and Fire Station #1 - (Hovde Properties Tenant Improvements)
05/04/12 6889 53W1433 2012 Madison Parking Ramp Maintenance
06/14/13 6886 53W1348 Ice Age Junction Trail
06/14/13 6886 53W1620 Jeffy Trail Sanitary Sewer Assessment District
08/17/12 6883 53W1426 Starkweather Creek Restoration 2012 - Anderson St
04/06/12 6882 53W1425 Regent Street Resurfacing with Utilities
01/01/12 6881 53W0712 Monona Drive Reconstruction - Ph 2
06/01/12 6877 53W1422 Garner Park Masonry Repairs 2012
05/04/12 6876 53W1421 Dairy Drive Test Well
06/29/12 6875 53W1420 Engineering Service Building PV System - 2012
07/13/12 6871 53W1415 Door Creek Culvert
05/11/12 6870 53W1414 Goodman Maintenance Facility, Building B-Heating and Ventilation Improvements
05/25/12 6869 53W1412 W. Johnson Street Curb and Terrace Repair
03/16/12 6864 53W1404 Cherokee Park Playground Equipment
07/13/12 6859 53W1400 Hudson Park Improvements
01/11/13 6857 53W1396 CIPP REHAB OF SANITARY SEWERS - 2012 PHASE 2
03/23/12 6856 53W1395 CIPP REHAB OF SANITARY SEWERS - 2012 PHASE 1
03/23/12 6856 53W0518 University Avenue Reconstruction
03/23/12 6856 53W1341 Manitou Way Resurfacing
08/10/12 6855 53W1035 Arboretum Pond 3 - Improvements Phase 2
03/02/12 6854 53W1394 Park Landscaping-2012
04/06/12 6851 53W1391 Streets South Point Rd - Salt Shed Roof Replacement
02/24/12 6848 53W1388 STH 113 Tree Planting and Landscaping - 2012
03/30/12 6846 53W1387 Citywide Median Planting - 2012
02/10/12 6843 53W1308 Resurfacing 2012
02/10/12 6842 53W1308 Resurfacing 2012
05/04/12 6840 53W1382 Cannonball Pipeline Phase 3
04/20/12 6838 53W1380 Monona Terrace Community & Convention Center Operable Partition Repair and Fabric Replacement
08/10/12 6837 53W1371 Senior Center Remodeling - Phase III
03/30/12 6836 53W1378 RESTORATION LANDSCAPING 2012
06/08/12 6835 53W1377 Kennedy Storm Bypass - Pipe - 2012
04/12/13 6834 53W1375 Paunack Park Shoreline
10/12/12 6833 53W1374 Burrows Park Shoreline
11/07/14 6832 53W0312 Wingra Creek Parkway, Phase 3
05/09/14 6831 53W1182 Yahara River Shoreline Repair
07/20/12 6829 53W1370 Forest Hill Cemetery Receiving Vault - Preservation of the North Wall
01/11/13 6828 53W1369 Olbrich Botanical Gardens Roof Replacement
01/27/12 6824 53W1367 Fairchild, Doty & Carroll Street (Outer Loop)
04/06/12 6816 53W0614 Beld Street Reconstruction
04/20/12 6815 53W1351 University Avenue Parking Lot University Ave final surface
02/10/12 6811 53W1353 Tenney Park Parking Lot Reconstruction
01/27/12 6810 53W1352 Warner Park Parking Lot Reconstruction-Phase 3
05/04/12 6809 53W1312 Utility Replacement with Resurfacing - 2012
03/09/12 6806 53W1310 Sidewalk, Curb & Gutter, Citywide Installation and Repair-2012
02/10/12 6805 53W1373 Horizontal Sawcutting of Concrete Sidewalk and Incidental Work-2012
02/10/12 6804 53W1311 Sidewalk Program-2012
03/09/12 6803 53W0603 S. Ingersoll St & Rutledge St Reconstruction
02/10/12 6802 53W1308 Resurfacing 2012
02/10/12 6801 53W1315 STORM WITH RESURFACING 2012
02/10/12 6801 53W1308 Resurfacing 2012
01/27/12 6800 53W1308 Resurfacing 2012
01/27/12 6799 53W1308 Resurfacing 2012
01/27/12 6798 53W1308 Resurfacing 2012
04/06/12 6797 53W1307 Repairing & Sealing Pavement Cracks, Major Streets-2012
04/06/12 6796 53W1306 Repairing & Sealing Pavement Cracks, Local Streets - 2012
01/27/12 6793 53W0608 N. Orchard St and Spring St Reconstruction
06/08/12 6792 53W1049 Midland Street Reconstruction
05/25/12 6791 53W1341 Manitou Way Resurfacing
06/08/12 6790 53W0613 Madison Street Reconstruction
06/08/12 6789 53W1148 Langdon Street Resurfacing
06/08/12 6789 53W0390 CTH M - Valley View Road - Pleasant View Road Intersection
06/08/12 6789 53W1305 Local Road Traffic Calming & Arterial Ped Enhancements-2012
03/09/12 6788 53W1188 Lawrence St, O'Sheridan St and Bresland Ct Reconstruction
04/05/13 6787 53W1246 Johnson St, E Bike Path
03/23/12 6786 53W1266 Ice Age Junction Trail – 2012
03/23/12 6785 53W1192 Gorham/Henry/Frances Reconstruction(State St side streets)
01/11/13 6783 53W1132 Fairchild & W. Mifflin St. Reconstruction (Outer Loop)
12/28/12 6782 53W0977 Elderberry Road and Samuel Drive (new roads)
07/13/12 6781 53W1350 Eastwood Drive Sidewalk & Capital City Path Realignment
04/06/12 6780 53W1303 Chip Sealing 2012-West
04/06/12 6779 53W1304 Chip Sealing 2012-East
01/27/12 6778 53W1296 Camden Road
07/13/12 6776 53W1297 Bike Paths 2012
05/10/13 6775 53W1055 Baltzell St and Cross St Reconstruction
08/17/12 6768 53W1329 Madison Police West District Carpet Replacement
06/15/12 6744 53W1094 LAKE EDGE BASIN REPAIR
06/08/12 6741 53W0942 Forsythia Cunette Rehabilitation
06/08/12 6741 53W1437 Bordner Park - Cunette Removal
07/13/12 6701 53W1242 Capital City Path - Segment 2
09/07/12 6656 53W1210 Tenney Maintenance Bridge
07/06/12 6611 53W1149 Block 101 Alley
05/27/13 6590 53W1152 Fire Station #13
04/20/12 6586 53W1142 Fire Station #2 Remodel
04/20/12 6579 53W0982 Langlois Street & Merrill Crest Dr
04/12/13 6505 53W1033 Mezzanine Construction-Sycamore
12/04/15 6484 53W1386 Engineering Operations Building Addition
10/05/12 6469 53W0945 Olbrich Drainage Ditch Stabiliztion
06/14/13 6465 53W0940 Bedford @ North Shore Storm Box Replacement
08/10/12 6457 53W1393 Madison Police Department Training Center - Phase 3
03/23/12 6444 53W0955 Rosa Road Resurfacing and Sidewalk
02/17/12 6369 53W0833 Tennis Court Resuracing - 2012
01/13/12 6311 53W0778 W. Lakelawn Place Reconstruction