This project is the design and construction of the Parks Division offices at the existing building located at 330 E Lakeside Street. The existing building will serve as the new location for Parks Division offices with potential to provide rentable spaces for community and private events. The building requires system upgrades, ADA and other health and safety compliance modifications, workspace updates, architectural upgrades, rental space improvements, and site improvements. A phased approach will be utilized to complete the work and only Phase 1 will be implemented under this contract.


City User Agency: Parks

Project Status: Planning

Architect/Engineer consultant RFP is due August 25, 2020
Design and Planning:  October 2020 thru April 2021

1st Advertisement of Bid: TBD
Bid Due Date: TBD
Construction Start Date: TBD
Expected Completion Date: TBD

LEED Goals: LEED Silver v4.1 minimum


Existing Olin Building

View from the Southwest (looking from the parking lot):

OlinSW
View from the Northwest looking at the entry:

OlinNW

View from the Northeast looking of the back of the building:

OlinNE