American Parkway Sidewalk

Project Details

  • Location

    • 5921 American Parkway
      Madison, WI 53718
  • Project Type

  • Status

    Completed
  • Estimated Schedule

  • Alder District

    District 17

Project Information

Project Details
This project will install new sidewalk where there is currently a gap in existing pedestrian facilities on the east side of American Parkway. Storm sewer will also be adjusted and installed as part of the project in order to maintain drainage patterns along the road ditch. An overview of the proposed installation can be found here: Plan Overview

Project Limits
Sidewalk will be installed in front of 5917, 5929, and 6001 American Parkway.

 

Was this page helpful to you?