Badger Lane Lift Station Replacement

March 27, 2025 Update

Lift station design is in the early stages with coordination underway between the project’s design consultant (MSA Consulting Inc.), City Engineering, and staff from the Madison Metropolitan Sewerage District. A public information meeting (PIM) for this project will be scheduled in the coming weeks once the lift station design and site layout are further along.

View past project updates »

Project Details

  • Location

    • 101 Nob Hill Road
      Madison, WI 53713
  • Status

    In Design
  • Impact

    Minor
  • Alder District

    District 14
  • Contract Number

Project Information

Project Overview

This project will replace the existing Badger Lane Lift Station located at the intersection of Nob Hill Road and Badger Lane. Ownership of this lift station was transferred to the City after annexation of the Town of Madison.

The existing dry-wet well facility will be replaced with a pre-fabricated submersible wet well style facility. In addition, the site layout will be re-oriented to allow operations staff better access to the lift station and its electrical controls for routine maintenance and in case of emergencies.

Along with the lift station, this project also includes include replacement of the existing the 8” cast iron forcemain running south on Badger Lane that is connected to the lift station (~350’ replacement). Replacement of this forcemain is expected to be completed using trenchless methods.

Project Limits

  • Intersection of Nob Hill Rd and Badger Ln (Lift Station replacement)
  • Badger Ln between Nob Hill Rd and Coyier Ln (Forcemain replacement)

Project Schedule

  • Design: Spring/Summer 2025
  • Anticipated Bid Date: Summer 2025
  • Construction Timeframe: 2025/2026

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

A public information meeting (PIM) for this project will be scheduled in the coming weeks once the lift station design and site layout are further along. 

City Process, Meetings

Common Council More information will be posted when available.

Board of Public Works More information will be posted when available.

Project Updates

March 27, 2025 Update

Lift station design is in the early stages with coordination underway between the project’s design consultant (MSA Consulting Inc.), City Engineering, and staff from the Madison Metropolitan Sewerage District. A public information meeting (PIM) for this project will be scheduled in the coming weeks once the lift station design and site layout are further along.