Commercial Avenue Sanitary Sewer Reconstruction

July 18, 2024 Update

Design of the sanitary sewer is far along and coordination with entities outside of the City is underway (Town of Blooming Grove, WisDOT, etc.). Board of Public Works approval for this project was obtained on 7/10/2024. The project will go to Common Council on 8/6/2024. The City is working to schedule a Public Information Meeting sometime over the next few weeks for this project.

View past project updates »

Project Details

  • Location

    • 618 Jacobson Avenue
      Madison, WI 53714
  • Project Type

  • Status

    In Design
  • Impact

    Minor
  • Alder District

    District 12
    District 15
  • Contract Number

Project Information

Project Overview

This project will replace and upsize approximately 1,678 feet of sanitary sewer along the Commercial Avenue service roads on both the north and south sides of State of Wisconsin Highway 30 (Highway 30) and along North Fair Oaks Avenue. The project will also include an approximately 235 feet of sanitary sewer across Highway 30 that will be installed using trenchless bore and jack methods. No other public improvements are expected with this project.

The work under this contract shall include, but is not limited to, installation of sanitary sewer main (open trench and bore & jack methods), lateral reconnections, and asphalt pavement patching. 

Project Overview Map

Project Limits

  • North Fair Oaks Avenue: Highway 30 exit ramp to Commercial Avenue (North)
  • Commercial Avenue (North): North Fair Oaks Avenue to Jacobson Avenue
  • Commercial Avenue (South): Jacobson Avenue to end of gravel service road

*Note – Work along Commercial Avenue (South) is within the Town of Blooming Grove Right-of-way

Project Schedule

Design: 2024

Anticipated Bid Date: August/September 2024

Construction Timeframe: TBD

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

A virtual public information meeting is currently being scheduled by City staff. Details regarding a date and time for this meeting will be made available as soon as possible.

If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call the City of Madison Engineering Division at 608-266-4751 or email engineer@cityofmadison.com

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglos para acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.
​​​​

City Process, Meetings

Common Council (8/6/2024)

Board of Public Works (7/10/2024) 

Project Updates

Design of the sanitary sewer is far along and coordination with entities outside of the City is underway (Town of Blooming Grove, WisDOT, etc.). Board of Public Works approval for this project was obtained on 7/10/2024. The project will go to Common Council on 8/6/2024. The City is working to schedule a Public Information Meeting sometime over the next few weeks for this project.

This page has been created. Check back to sign up for the email list.

Was this page helpful to you?