Doncaster Beverly Danbury Reconstruction

October 29, 2024 Update

A very spooky paving on Doncaster Drive is tentatively scheduled for Thursday 10/31/2024, weather permitting. Assuming paving happens this week, the streets division will be informed so that they can perform leaf pickup next week as regularly scheduled. Happy Halloween! 

View past project updates »

Project Details

  • Location

    • 4240 Beverly Road
      Madison, WI 53711
  • Project Type

  • Status

    In Design
  • Estimated Schedule

  • Impact

    Major
  • Alder District

    District 10
  • Contract Number

Project Information

Project Overview

Doncaster Beverly Danbury Reconstruction Exhibit A Map

The overall project includes full pavement reconstruction, new curb & gutter, new sidewalk, replacement of sanitary and water mains, and replacement of storm sewer where necessary.

Doncaster Drive, Beverly Road, and Danbury Street are being reconstructed with new curb & gutter and sidewalk. Parking will be allowed on one side only. The terrace (between the sidewalk and street) will be 2.5 ft. The options in Exhibit A have been developed to reflect three competing priorities: pedestrian safety and convenience, maintenance of existing trees, and proper street width.

 

Project Limits

Doncaster Drive – Danbury Street to Seminole Highway

Beverly Road – Wenona Way to Seminole Highway

Danbury Street – Doncaster Road to Mohawk Drive

Project Schedule

Design: 2024

Construction: 2024

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

March 21, 2024 Public Information Meeting Recording

March 21, 2024 Public Information Meeting PowerPoint Presentation

If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call Mario Galindez of the Engineering Division at 608-266-4095.

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglospara acceder a este servicio, actividad o programa, llama Mario Galindez en el departamento de ingenieria municipal inmediatamente a (608) 266-4095.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.
​​​​

City Process, Meetings

The design team will present the street layout options to the Transportation Commission March 27, 2024

Board of Public Works: April 17, 2024

Common Council: May 7, 2024

 

Mailings

Board of Public Works: April 17, 2024 Notice of Meeting Fact and Details Sheet Schedule of Assessments

Project Updates

October 29, 2024 Update

A very spooky paving on Doncaster Drive is tentatively scheduled for Thursday 10/31/2024, weather permitting. Assuming paving happens this week, the streets division will be informed so that they can perform leaf pickup next week as regularly scheduled. Happy Halloween! 

October 1, 2024 Update

This week the contractor is wrapping up underground work for this year on Doncaster Drive. Next week, the contractor will move into base preparation followed by curb, driveways, and pavement before construction shuts down for the winter. Look for further updates and notifications in the spring when this project resumes on Danbury Street and Beverly Road.

September 4, 2024 Update

Construction has started on Doncaster Drive. The contractor is working on installing the new sanitary sewer main and will continue to do so in the coming weeks, followed by sanitary lateral installation at every address along the street. Thank you to all who came to us with concerns about the crossing at Seminole Highway and excessive dust. We are working with the contractor to make sure those issues are resolved. Please do not hesitate to reach out should more issues arise. View updated plans

July 31, 2024 Update

Construction on Doncaster Drive will begin the week of August 19, 2024. Beverly Road and the majority of Danbury Street will be constructed in the spring, with a final completion date of May 31, 2025. Thank you for everyone’s patience as we confirmed these dates with the contractor, S&L Underground. View updated plans. 

View the linked fact sheet for more information.

 

April 5, 2024 Update

Thank you to all who attended the public meeting on March 21st, and everyone who has emailed, called, or spoken with me in person. With approval from the Transportation Commission and outright support from a majority of questionnaire respondents, the design team is moving forward with Option A pending approval from the Board of Public Works and Common Council. See link below for the preliminary design plan view, which includes planned tree removals marked with an X (all on page 3).

View Plan

If you said you were interested in a rain garden in the questionnaire, we are narrowing down those properties which are eligible, and you will be receiving an email from our team when we have a preliminary determination.

Additionally, if you have or would like a walkway between your house and the street/sidewalk, please reach out to the project manager to discuss options. We will be reaching out to all those we have contact information for to iron out the walkway details according to homeowner preference.

March 25, 2024 Update

Survey deadline extended:

Please complete the Questionnaire by 11 a.m., March 27, 2024.

Doncaster Beverly Danbury Reconstruction Questionnaire

March 22, 2024 Update

Thank you to everyone who attended the March 21, 2024 Public Information Meeting. The meeting materials are now available. Please share with any neighbors who were not able to attend. 

March 21, 2024 Public Information Meeting Recording

March 21, 2024 Public Information Meeting PowerPoint Presentation

Please complete the Questionnaire by 11 a.m., March 25, 2024.

Doncaster Beverly Danbury Reconstruction Questionnaire

March 11, 2024 Update

The project page has been created. 
The project design phase is in progress. A public information meeting is scheduled for 6 p.m., March 21, 2024, via Zoom. Registration is required prior. 

March 21, 2024 Public Information Meeting Registration

March 21, 2024 Public Information Meeting PowerPoint Presentation

Please complete the Questionnaire by 11 a.m., March 25, 2024. 

Doncaster Beverly Danbury Reconstruction Questionnaire