Evergreen, Ohio, Sommers Reconstruction

October 17, 2024 Update

This page has been created. Please sign up for updates through the email list.

A public information meeting is scheduled for 6:30 p.m., Nov. 19, 2024, via Zoom. Registration prior is required. 

Nov. 19, 2024 Public Information Meeting Registration

View past project updates »

Project Details

  • Location

    • 2322 Sommers Ave
      Madison, WI 53704
  • Project Type

  • Status

    In Design
  • Estimated Schedule

  • Impact

    Major
  • Alder District

    District 15
  • Contract Number

Project Information

Project Overview

The City is planning to reconstruct Evergreen Ave (Center Ave to Atwood Ave), Ohio Ave (Center Ave to Atwood Ave), Sommers Ave (Dunning St to Hudson Ave) and replace the traffic signal at the intersection of Hudson Ave and Atwood Ave.

The project includes the replacement of sanitary sewer and laterals, partial water main and services, storm sewer main and laterals, curb and gutter, gravel base, and asphalt pavement. The sidewalk will be spot replaced as needed.

Evergreen Ohio Sommers - Overall Exhibit

Project Limits

Evergreen Ave – Center Ave to Atwood Ave

Ohio Ave – Center Ave to Atwood Ave

Sommers Ave – Dunning St to Hudson Ave

Hudson Ave and Atwood Ave intersection

Project Schedule

Design: Fall/Winter 2024/2025

Bids Advertised: Spring 2025

Construction: Summer – Fall 2025

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

A public information meeting is scheduled for 6:30 p.m., Nov. 19, 2024, via Zoom. Registration prior is required.

Nov. 19, 2024 Public Information Meeting Registration

A postcard will also be mailed out to residents in the neighborhood informing them about the meeting and directing them to the website to register. Meeting topics include project limits, street design, utility installation, construction timeline, and street assessments. Residents will have the opportunity to ask questions.

If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call Andrew Zweig of the Engineering Division at 608-266-9219.

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglospara acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.

City Process, Meetings

Common Council March 11, 2025

Board of Public Works February 26, 2025

Project Updates