![Bees on a honeycomb.](/sites/default/files/styles/banner_desktop/public/engineering/images/assets/engineering-banner.jpg?h=300de2dc&itok=z2GwlydI)
Fire Station 14 Training Tower
Project Details
Project Information
Follow the Progress on Fire Station 14's Flickr Page
Updated: October 17, 2019
Status: Completed!
Here are a few features of the new FS14 Training Tower:
![FS14TrainingTower1](https://www.cityofmadison.com/sites/default/files/styles/non_cropped_lg/public/engineering/images/projects/FS14TrainingTower1.jpg?itok=2HJJn_po)
![FS14TrainingTower2](https://www.cityofmadison.com/sites/default/files/styles/non_cropped_lg/public/engineering/images/projects/FS14TrainingTower2.jpg?itok=Jm5aqwyL)
![FS14TrainingTower3](https://www.cityofmadison.com/sites/default/files/styles/non_cropped_lg/public/engineering/images/projects/FS14TrainingTower3.jpg?itok=iRkRSQkw)
Fire Station 14 Training Tower
The training tower located at Fire Station 14 is a stand-alone 800 square foot, tri-level treated wood structure. The building is an open air structure for training purposes and will not be occupied at non-training times. The building will not contain plumbing, HVAC, electrical or data systems.
City User Agency: Madison Fire Department
Planning and Design: 2019
Advertisement of Bid: 05/24/2019 available on Bid Express
Bid Due Date: 06/06/2019
Construction Start Date: 07/24/2019
Expected Completion Date: 10/11/2019
"All information regarding dates/times/locations are informational and should be verified with official bidding documents posted on Bid Express."
Rendering of Proposed Training Tower