Construction Update

The contractor is making plans to restore the project for the winter.  Due to low temperatures and frozen gravel the restoration will be considered temporary.  The road, driveways and sidewalk will be restored with hard surfaces, most likely asphalt.  Terraces will be filled in along the sidewalk and edge of pavement.  Please note no concrete curb and gutter will be placed this fall.  Temporary asphalt will be placed to act as a gutter to drain water to the storm inlets.

Once completed the road will be opened to all traffic.


In the spring of 2020, the temporary surfaces will be removed and replaced with permanent surfaces.

 

Haywood Dr is currently open to local traffic only.

Project Description

The project consists of the replacement of the sanitary sewer, lateral installation and storm sewer improvements. Haywood Drive will be reconstructed with new curb and gutter, driveways and new asphalt pavement. Spot replacement of sidewalk will be done as necessary for installation of sewer laterals. Concrete speed humps will also be installed as part of this reconstruction.

Project Limits

Haywood Drive - North Wingra Drive to North Park Street

Project Schedule

City Work will begin in early July and is expect to last for 2-3 months.