S. Pinckney Street Resurfacing

April 15, 2024 Update

This project is complete. 

View past project updates »

Project Details

  • Location

    • 223 S Pinckney St
      Madison, WI 53703
  • Status

    Completed
  • Estimated Schedule

  • Impact

    Major
  • Alder District

    District 4
  • Contract Number

Project Information

Project Overview

The purpose of this project is to resurface the street and replace storm sewer on S. Pinckney Street from E. Doty Street to E. Wilson Street. Proposed work includes replacement of the asphalt pavement and road base and replacement of the curb and gutter, sidewalk, storm sewer and private storm sewer connections as needed.  Street improvements would also include the installation of a street median island, adding a valet pullout area adjacent to the hotel development, and installing bike lane pavement markings.

View Proposed Assessments

Project Limits

S. Pinckney Street from E. Doty Street to E. Wilson Street

Project Schedule

Design: Fall/Winter 2022
Construction: April 2023
Scheduled Completion: June 2023 (Approximate)

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

Sept. 22, 2022 Public Information Meeting PowerPoint Presentation
The meeting will cover details on the project design, construction schedule, residential impacts, and special assessments. The presentation and meeting recording will be posted on this webpage after the meeting.

If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call Reid Stiteley of the Engineering Division at (608) 266-4093.

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglos para acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.

City Process, Meetings

Common Council: More information will be posted when available.
Board of Public Works: More information will be posted when available. 

Project Updates

This project is complete. 

The new storm sewer main and storm inlet structures on S. Pinckney have been installed. This week, the contractor is constructing the underground support system for the median island, which will allow two new trees to be planted and grow within the island. The following week, new curb and gutter will be installed along the northern side of S. Pinckney St and for the median island. After curb and gutter is installed, work will resume on the median island and the street will be prepared for asphalt paving.

S. Pinckney Street (E. Doty St to E. Wilson St) will be closed to through traffic for the duration of the project. The anticipated completion date for the project is Nov. 5, 2023.