West Towne Path – Phase 3

November 8, 2024 Update

This project is complete. 

View past project updates »

Project Details

  • Location

    • Plaza Drive
      Madison, WI 53719
  • Project Type

  • Status

    Completed
  • Impact

    Minor
  • Alder District

    District 1
  • Contract Number

Project Information

Project Overview

The City is proposing a new extension of the West Towne Path that will connect the existing paths from Commerce Dr to S Junction Rd. The proposed off-street, multi-use path would be 10-ft wide and follow along the north-side of Plaza Dr and Watts Rd, which would be partially reconstructed to fit the path within existing City Right-of-Way. The proposed project would also include bike/pedestrian crossing improvements at the intersections.

View Project Map.

Project Limits

Watts Rd: S Junction Rd to Plaza Dr
Plaza Dr: Watts Rd to Commerce Dr

Project Schedule

Planning/Design: 2022
Construction: 2023

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

May 18, 2022 Public Information Meeting PowerPoint Presentation 

May 18, 2022 Public Information Meeting Recording

If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please email the Project Manager Aaron Canton of the Engineering Division at acanton@cityofmadison.com.

Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglos para acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.

Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no. ​

City Process, Meetings

Common Council: Fall 2022
Board of Public Works: Fall 2022

Project Updates

November 8, 2024 Update

This project is complete. 

June 1, 2023 Update

The West Towne Path – Phase 3 project has been awarded to Parisi Construction. Work is scheduled to begin the week of June 5, 2023. The project is anticipated to go till mid-to-late August 2023. Lane closures on S Junction Rd, Watts Rd, Plaza Dr, and Commerce Dr will occur as needed. At least one-lane in each direction on all streets will be maintained for a majority of the project, with the exception of Plaza Dr which will be converted to a one-way street for southbound traffic-only (Commerce Dr to Watts Rd) for the duration of the project. All commercial driveways will remain accessible at all times throughout construction, except immediately during paving operations.