1. Resources for the Madison Community

    Madison stands with the families of Abundant Life community. This page is dedicated to connecting victims and the broader community to resources and accurate information about the tragic events that happened on December 16.

Traffic Engineering to Install Temporary Traffic Diverter on E Mifflin St

posted 

Starting Monday, October 14, Traffic Engineering will be conducting a vehicular traffic diverter test on East Mifflin Street at North Paterson Street. This project focuses on improvements to the East Mifflin Bicycle Boulevard which provides an important connection to residences on the near eastside of Madison as well as providing an alternative to riding on East Washington Ave to reach destinations along this major corridor.

During this time:

  • No westbound vehicles will have access to continue along East Mifflin Street past North Paterson Street.
  • Vehicles traveling West on East Mifflin Street will be able to turn left and right at North Paterson Street.
  • Bicyclists and Pedestrian movements will be maintained in all directions.
Temporary traffic diverter placement on E Mifflin st.  Traffic headed west will need to turn at N Paterson to continue.

The diverter test is expected to be completed sometime in Winter 2024.

Share your opinion: The City will gather feedback on the test through November. You can give your feedback on the traffic diverter test by filling out a brief online survey.

Learn more about the East Mifflin Bike Boulevard Improvement recommendations and view the traffic diverter plan.

 

Was this page helpful to you?