1. Resources for the Madison Community

    Madison stands with the families of Abundant Life community. This page is dedicated to connecting victims and the broader community to resources and accurate information about the tragic events that happened on December 16.

Vision Zero Projects

VZ Project Map

Projects in Progress:

Park St & Badger Rd Intersection

  • Upgrade to continental crosswalks

Park St & Buick St Intersection

  • Upgrade to continental crosswalks

Highland Ave & University Ave

  • Install continental crosswalks
  • Install protected Left Turn with new controller

East Washington Ave (Pinckney to Baldwin)

  • Upgrade all crosswalks to continental crosswalks
  • Retiming (7) traffic signals along the corridor to promote speed reduction

East Washington Ave (Baldwin to Marquette)

  • Retiming (6) traffic signals along the corridor to promote speed reduction

East Washington Ave & Livingston St

  • Install bollards on median


Upcoming Projects:

Gammon Rd Corridor from Watts to Colony

  • Reduce speed limit from 35 mph to 30 mph
  • Re-timing (9) traffic signals along the corridor to promote reduced speed


Completed Projects:

Speed reductions on East Washington Ave

  • Pinckney Street to Baldwin Street from 35 mph to 25 mph
  • Baldwin Street to Marquette Street from 35 mph to 30 mph

Milwaukee St from Stoughton Rd to Thompson

  • Reduce speed limit from 35mph to 25mph

Prairie Rd from Raymond Road to Maple Grove Road

  • Reduce speed limit from 30 mph to 25 mph

Highland Ave & University Ave

  • Implement lead pedestrian intervals
  • Automatic pedestrian recalls
  • Improved pedestrian signing
Was this page helpful to you?