Metro Bus Barn Study- East Washington Ave.
Project Details
Project Information
UPDATE: April 11, 2018
Added Study Reports - See links below
Metro Transit Space Needs Study
This study scope includes an existing building condition assessment, a mechanical, electrical, plumbing systems evaluation, and evaluation of processes and process equipment. It includes an assessment of safety issues, a major capital improvement plan – prioritizing these projects – ranking from non-critical to critical, creating a conceptual phasing plan to determine how improvements would be made while the building is fully-operational, development of an on-going, long-term facility maintenance and capital budget plan, cost estimates for all planned capital improvements and a life-cycle analysis of the improvement(s).
Study Reports:
- Madison Metro Transit Building - Master Plan Report
- Madison Metro Transit Building - Master Plan Report General Appendix
- Madison Metro Transit Building - Executive Summary and Recommendations (Part 1 of Master Plan Report)
- Madison Metro Transit Building - TPC Presentation (Pulled from Master Plan Report General Appendix)
- Madison Metro Transit Building - Report Overview
Project History:
May 17, 2017 File #46995
Authorizing the Mayor and the City Clerk to execute an agreement with Mead & Hunt for an Existing Facility and Life Safety Assessment, including conceptual design documents, maintenance plan, upgrade plan, phasing and capital budget planning of the Metro Transit Bus Barn
March 2017:
The project is currently in the process of interviewing and selecting a consultant for this project.