ROUTES 6, 14, 15, 25, 56 & 57 DETOUR: E. Washington Construction

posted 

Starts late March Due to construction on East Washington, Routes 6, 14, 15, 25, 56 and 57 buses will require closures and relocations of bus stops between Dickinson and Fourth Street. When Stage 2 of construction begins on the north side of East Washington in late March or early April - the bus stops on each side of East Washington near the railroad Crossings between the Yahara River and First Street will be closed. The bus stops in each direction at Second Street will also be closed. Temporary bus stop locations on East Washington will be located adjacent the pedestrian crosswalk locations at the First Street intersection in both directions. These bus stop modifications are expected to last through October. Complete information on this project is available at mymetrobus.com.

Links

Departments:
Was this page helpful to you?