1. Resources for the Madison Community

    Madison stands with the families of Abundant Life community. This page is dedicated to connecting victims and the broader community to resources and accurate information about the tragic events that happened on December 16.

  1. Engineering Downtown Offices Closed to Public, Dec. 26 & 27, 2024.

    Offices will be closed, however, City of Madison Engineering Division staff will be available by phone: 608-266-4751 and email: engineering@cityofmadison.com.

Groveland Terrace

Project Details

  • Location

    • 5418 Groveland Terrace
      Madison, WI 53716
  • Project Type

  • Status

    Completed
  • Estimated Schedule

  • Impact

    Minor
  • Alder District

    District 16

Project Information

Construction Update

5/22/20 This project is complete.

Project Description

This project is a proposed rural-to-urban project that will include the installation of sidewalk and curb and gutter as well as new pavement. Curb and sidewalk will be installed on both sides of the roadway and the roadway will be constructed to be 32'-wide from face of curb to face of curb. Sanitary sewer main and laterals will also be replaced with this project and new storm sewer will be installed. No water main replacement will occur with the project.

Project Limits

Groveland Terrace - Pflaum Rd. to Tompkins Dr.

Project Schedule

This project is anticipated to start in May and construction is expected to last approximately 3-4 months. In anticipation of construction, Madison Gas and Electric will be performing utility work on their gas facilities beginning in late March.

Public Information Meeting

A Public Information Meeting was held on Tuesday December 18th. The presentation from the meeting can be found here: PIM Presentation