Cedar Street, Beld Street Reconstruction, Cedar Street Phase 2 Construction

Project Details

  • Location

    • 633 Cedar Street
      Madison, WI 53715
  • Project Type

  • Status

    Completed
  • Estimated Schedule

  • Impact

    Major
  • Alder District

    District 13
    District 14
  • Contract Number

Project Information

Project Update

12/5/2022 Update:

The project is complete.

Project Overview

The City is planning to reconstruct Cedar Street (S. Park Street to Gilson Street) and Beld Street (Pine Street to Cedar Street) in 2022. The City is also planning to construct a new block of Cedar Street (Fish Hatchery Road to South Street).

Cedar Street and Beld Street will be realigned to create a safer connection to S. Park Street. Beld Street would directly connect to S. Park Street and Cedar Street would connect to Beld Street. Full vehicle access allowed to Cedar Street. The project includes the replacement of sanitary sewer and laterals, water main and services, storm sewer main and laterals, curb and gutter, and asphalt. The sidewalk will be spot replaced along Cedar Street as needed. The entire sidewalk along Beld Street will be replaced.

The new block of Cedar Street to be constructed extends the 2021 Cedar Street project to Fish Hatchery Road from South Street. Appleton Road will be removed. The project includes new storm sewer, curb and gutter, sidewalk, and asphalt. The existing median within Fish hatchery Road at Appleton Road will be removed and replaced to match the Cedar Street connection.

Exhibit Cedar Street 
Exhibit Cedar and Beld

Cedar, Beld, South Park Street Fact Sheet

Project Limits

Cedar Street (reconstruction) – S. Park Street to Gilson Street
Cedar Street (new street) – Fish Hatchery Road to South Street

Project Schedule

Design: Summer/Fall 2021
Bids Advertised: December 2021
Construction Cedar Street, Beld Street and South Park Street: April – August 2022
Construction Cedar Street (Fish Hatchery Road to South Street): July-September 2022

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

Sept. 28, 2021 Public Information Meeting Recording
Sept. 28, 2021 Public Information Meeting PowerPoint Presentation
Thank you to everyone who attended the pre-construction in-person site visit March 24, 2022.

Survey

Thank you everyone for taking the survey offered for this project.

City Meetings, Process

Board of Public Works Nov. 17, 2021
Common Council: Dec. 7, 2021

Mailings

Cedar Street and Beld Street Assessment  District - 2022 Board of Public Works mailing

Cedar Street Assessment District - 2022 Board of Public Works mailing

Cedar, Beld, South Park Street Fact Sheet

Was this page helpful to you?