Sidewalk Replacement Program
May 2, 2024 Update
Thank you to everyone who attended our public information meeting for District 11. The meeting materials are now available:
May 1, 2024 Public Information Meeting Recording
May 1, 2024 Public Information Meeting PowerPoint Presentation
View past project updates »Project Details
Project Information
Project Overview
The Annual Sidewalk Replacement Program was created to identify and repair defects (cracks, broken sections, offsets creating trip hazards, ponding/icing issues) throughout the City, rotating through the alder districts on a 10-year cycle.
In 2024, the Sidewalk Replacement Program will be performing work within Aldermanic Districts 11 and 19.
Sidewalk sections marked with white arrows or X’s are designated for replacement. Sidewalk sections with tripping hazards, marked with a pink line across the joint and a white ‘C’, are designated for saw cutting. Separate contracts are bid for the replacement and the saw cutting.
- Criteria for Replacement of Public Sidewalk and Curb and Gutter
- Care and Restoration of Disturbed Turf Areas - Brochure
- Street Assessment Policy
- ADA Ramp Replacement Guidelines
Project Limits
Each cycle focuses on different districts. In 2024, sidewalk sections will be repaired and replaced throughout Aldermanic Districts 11 & 19.
Project Schedule
District 19: 04/8/2024 to 10/04/2024
District 11: 05/20/2024 to 10/25/2024
Public Involvement
There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:
Public Information Meetings
- May 1, 2024 Public Information Meeting Recording
- May 1, 2024 Public Information Meeting PowerPoint Presentation
- March 20, 2023 Public Information Meeting Recording
- March 20, 2024 Public Information Meeting PowerPoint Presentation
If you need an interpreter, translator, materials in alternate formats or other accommodations to access this service, activity or program, please call Bill McGlynn of the Engineering Division at 608-266-4537.
Si necesita un intérprete, un traductor, materiales en formatos alternativos u otros arreglos para acceder a este servicio, actividad o programa, comuníquese inmediatamente al número de teléfono que figura a continuación.
Yog tias koj xav tau ib tug neeg txhais lus, ib tug neeg txhais ntawv, cov ntaub ntawv ua lwm yam los sis lwm cov kev pab kom siv tau qhov kev pab, kev ua num los sis kev pab cuam no, thov hu rau tus xov tooj hauv qab no tam sim no.
City Process, Meetings
Common Council: Dist 19 – 01/23/2024 Dist 11 – 03/05/2024
Board of Public Works: Dist 19 – 01/10/2024 Dist 11 – 02/21/2024
Sidewalk Repair Schedule by Alder District
Year | Alder District & Ward |
---|---|
2017 | Districts 15 & 17 |
2018 | Districts 3 & 16 |
2019 | Districts 1, 7 & 9 |
2020 | Districts 4 & 8 |
2021 | Districts 13 & 14 District 14:
District 13: |
2022 | District 5 |
2023 | Districts 12 & 18 |
2024 | District 11 & 19 |
2025 | District 10* & 20 (*Except District 10, Ward 79. Previously District 14, Ward 75 completed in 2021) |
2026 | District 2 & 6 |
2027 | District 3 & 17 |
2028 | District 15 & 16 |
2029 | District 1 & 9 |
2030 | District 4 & 13 (Census) |
2031 | District 5 & 8 |
2032 | District 7 & 20 |
2033 | District 10 & 14 |
2034 | District 12 & 18 |
2035 | District 11 & 19 |
2036 | District 2 & 6 |
2037 | District 3 & 17 |
2038 | District 15 & 16 |
2039 | District 1 & 9 |
2040 | District 4 & 13 (Census) |
2041 | District 5 & 8 |
Forms
List of Prequalified Contractors
Related Ordinances, Statutes, & Administrative Procedures
- Madison General Code of Ordinances:
Sidewalks addressed by Section 10.06 & 10.09 - Wisconsin Statutes - Sidewalks addressed by Section 66.0907, Wisconsin State Legislature
- Street Patching Criteria
- Terrace Treatment Policy