1. Resources for the Madison Community

    Madison stands with the families of Abundant Life community. This page is dedicated to connecting victims and the broader community to resources and accurate information about the tragic events that happened on December 16.

Road Reconstruction

Road reconstruction is the most disruptive because the street has been evaluated and decided it needs the most improvement. Road reconstruction projects are streets with curb and gutter in poor condition along with poor pavements. The projects include complete replacement of curb and gutter, pavement and roadway base (gravel). Sidewalks in poor condition are also replaced as needed.

Reconstruction photo example

They also include the replacement of at least one underground utility with the possibility of more.  The City underground utilities include sanitary sewer, water and storm sewer.  Some projects also include new storm sewer when none has existed prior in order to correct existing drainage and flooding issues.

All city streets are rated every two years and the pavement rating is used to help determine which streets are placed on the list.

The following items influence the scheduling of any specific area:

  • Very poor pavements
  • Storm sewer flooding, ponding and pavement icing issues
  • Failing water mains (numerous water main breaks)
  • Failing sanitary sewer (cracked pipes, sewage backups)
  • Traffic volumes
  • Need for improved pedestrian or bicycle facilities
Was this page helpful to you?