-
Resources for the Madison Community
Madison stands with the families of Abundant Life community. This page is dedicated to connecting victims and the broader community to resources and accurate information about the tragic events that happened on December 16.
Engineering Policies and Agreements
Section 1: General Administration
- 1.1 Change Order Policy
- 1.2 Deferred Assessment Process
- 1.3 RFP Selection Guidelines
- 1.4 Report to Council for Non-Contract Work Done by City Forces
- 1.5 Legal Use of City Owned Lands
- 1.6 Exemptions to RFP Process
- 1.7 Placing an Item on BPW CC Agenda
Section 2: Personnel
- 2.1 Customer Service
- 2.2 Engineering Telework Policy
- 2.3 Engineering Air Quality Job Action Sheet
- 2.4 Engineering Telework Agreement Form
Section 3: Operational
- 3.1 Pesticide Use
- 3.2 Volunteers
- 3.2.1 Volunteer Waiver Release Form Word Document and PDF Document
- 3.2.2 Volunteer Citywide APM 2-44
- 3.3 Adopt-A-Median
Section 4: Storm Sewer
- 4.1 Drainage Policy for Private Properties
- 4.2 Greenways Use Policy
- 4.3 Greenway Tree Policy
- 4.4 Membership for Advocacy Groups
- 4.5 Pond Acceptance from Development
- 4.6 Storm Assessment
- 4.6.1 Storm Assessment PDF and Word Document
- 4.6.2 Control Works
- 4.7 Stormwater Utility Rate Adjustments
- 4.8 Mowing and Land Management
Section 5: Sanitary Sewer
- 5.1 Sanitary Sewer Backwater Valve Program
- 5.2 Sanitary Lateral Replacement Funding Policy
- 5.3 Sanitary Lateral Relocation Funding Policy
- 5.4 Sanitary Sewer Assessment Policy
- 5.5 Sanitary Sewer Lateral Pavement Restoration Policy
Section 6: Streets
- 6.1 ADA Sidewalk Ramp Policy
- 6.2 Street Assessment Policy
- 6.3 Signal Assessment Policy
- 6.4 Interchange Assessment Policy
- 6.5 Terrace Treatment Policy
- 6.6 Southwest Multiuse Trail Encroachment Policy
Section 7: Facilities
Section 8: MOU's
- 8.1 Water Utility
- 8.2 Street Trees
- 8.3 Fleet Services
- 8.4 Parks Division
- 8.5 Information Technology
- 8.6 Metro Transit
- 8.7 Other
- 8.8 Storm and Sanitary Agreements
- 8.8.1 MGE Odana Infiltration and Location Map
- 8.8.2 Maple Bluff Pond Resolution and Ponds
- 8.8.3 Yahara Wins Adaptive Management
- 8.8.4 Monona Lake Edge Pond
- 8.8.5 West Towne Area Retention Basin Use Agreement
- 8.8.6 MATC Ditch Maintenance Agreement
- 8.8.7 MMSD Drying Bed Use
- 8.8.8 Arboretum MOU
- 8.8.9 Sanitary Industrial Drive
- 8.8.101 Hawks Landing Gold Course Stormwater
- 8.9 UW Storm Agreement
Section 9: Construction
- 9.1 Bid Opening SOP
- 9.2 Terrace Treatment Policy
- 9.3 Criteria for Sidewalk and Curb and Gutter