East Streets Maintenance Facility Fire Sprinkler Replacement

Project Details

  • Location

    • 4602 Sycamore Avenue
      Madison, WI 53704
  • Project Type

  • Status

    In Design
  • Estimated Schedule

  • Alder District

    District 17

Project Information

Project Overview

Replacement of dry sprinkler system in garage and shop areas. The old system from 1981 is corroded through and is leaking.

Project Schedule

City User Agency: City of Madison Streets Division

1st Advertisement of Bid: TBD 2025 available only on Bid Express 
Pre-Bid Building/Site Contractor Meeting: TBD
Bid Due Date: TBD
Construction Start Date: TBD
Expected Completion Date: Qtr. 4 2025

"All information regarding dates/times/locations are informational and should be verified with official bidding documents posted on Bid Express."

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

City Process Meetings

TBD

Was this page helpful to you?