- City of Madison
- Engineering
- Projects
- South Towne Dr/W. Broadway Bridge over us 12/18 (Madison Beltline)
South Towne Dr/W. Broadway Bridge over us 12/18 (Madison Beltline)
Last Updated: 10/09/2020
Latest Update
New information will be posted soon.
Project Overview
The State of Wisconsin Department of Transportation currently has a project to make structural repairs and place a concrete overlay on the bridge deck. Details can be found at the State website:
https://projects.511wi.gov/southtowne/
Project Limits
New information will be posted soon.
Project Schedule
New information will be posted soon.
Public Involvement
New information will be posted soon.
Project Details
Project Type: Road Construction
Location(s):
- 2400 Broadway
Madison, WI 53713
Area: East, South
Aldermanic District(s): District 14
Contract Number: n/a
Estimated Schedule: 04/01/2020 to 11/01/2020
Project Status: Construction
Project Contact:
- Greg Brecka608-245-2671