Last Updated: 05/03/2022

Latest Update

5/2/2022 Update:
The results from the most recent speed hump residential survey will be presented at the next Transportation Commission meeting on May 11, 2022. The feedback and recommendations from the Transportation Commission will be used to decide if the speed hump is installed on Kroncke Drive with the ongoing street resurfacing and utility replacement project. Information on how to attend the virtual meeting and how to submit written comments for agenda items is available in the link below:

https://www.cityofmadison.com/city-hall/committees/transportation-commission/5-11-2022

Project Overview

The purpose of this project is to resurface the street and replace utilities on Kroncke Drive from Tanager Trail to S. Whitney Way, Lanett Circle from Kroncke Drive to end, and Tanager Trail from Mayhill Drive to Meadowood Drive. Proposed work includes removal and replacement of asphalt pavement, replacement of sanitary sewer main and laterals, storm sewer and private storm sewer connections, and replacement of curb and gutter, drive aprons, and sidewalk as needed.

Preliminary Project Overview Plan
Fact and Detail Sheet

Project Limits

Kroncke Drive from Tanager Trail to S. Whitney Way, Lanett Circle from Kroncke Drive to end, and Tanager Trail from Mayhill Drive to Meadowood Drive.

Project Schedule

Design: Summer/Fall 2021 Construction: Spring/Summer 2022

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

July 29, 2021 Public Information Meeting PowerPoint

City Meetings, Hearings, Process

Common Council: 8/31/2021
Board of Public Works: 8/18/2021
Public Information Meetings: 7/29/2021