Kroncke Drive, Lanett Circle, Tanager Trail Resurfacing w/ Utilities

Project Details

  • Location

    • 5799 Kroncke Drive
      Madison, WI 53711
  • Status

    Completed
  • Estimated Schedule

  • Impact

    Minor
  • Alder District

    District 20
  • Contract Number

Project Information

Latest Update

7/21/2022 Update:

This project is complete. 

Project Overview

The purpose of this project is to resurface the street and replace utilities on Kroncke Drive from Tanager Trail to S. Whitney Way, Lanett Circle from Kroncke Drive to end, and Tanager Trail from Mayhill Drive to Meadowood Drive. Proposed work includes removal and replacement of asphalt pavement, replacement of sanitary sewer main and laterals, storm sewer and private storm sewer connections, and replacement of curb and gutter, drive aprons, and sidewalk as needed.

Preliminary Project Overview Plan
Fact and Detail Sheet

Project Limits

Kroncke Drive from Tanager Trail to S. Whitney Way, Lanett Circle from Kroncke Drive to end, and Tanager Trail from Mayhill Drive to Meadowood Drive.

Project Schedule

Design: Summer/Fall 2021 Construction: Spring/Summer 2022

Public Involvement

There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings. Dates, times and locations are indicated below:

Public Information Meetings

July 29, 2021 Public Information Meeting PowerPoint

City Meetings, Hearings, Process

Common Council: 8/31/2021
Board of Public Works: 8/18/2021
Public Information Meetings: 7/29/2021

 