E Mifflin Bicycle Boulevard
E Mifflin Diverter Project
December 4, 2024 - Update
The E Mifflin Diverter Test was completed on December 2nd, 2024. All signing and marking has been returned to previously existing conditions.
E Mifflin Bike Boulevard improvements are scheduled for review at the December 11th Transportation Commission meeting. If approved, improvements are anticipated to be constructed in Summer 2025.
October 1, 2024
A test of a motor vehicle traffic diverter at E Mifflin and S Paterson will be installed the week of October 14, 2024.
The test is anticipated to last until mid-November. Data on traffic volumes and speeds on E Mifflin St and E Dayton St have been collected before installation of the diverter and will also be collected after trial installation. The public is also encouraged to provide feedback.
Project Overview
This project focuses on improvements to the East Mifflin Bike Boulevard which provides an important connection to residences on the near eastside of Madison as well as providing an alternative to riding on East Washington Ave to reach destinations along this major corridor.
Project Limits
E Mifflin St: Capitol Square to N Dickinson St
Project Schedule
Design and Trial Project: 2024
Construction: 2025
Public Involvement
Virtual Public Meeting on Mon, June 3, 2024
- Presentation
- Feedback Summary
City Process, Meetings
Transportation Commission
- July 31, 2024 - Discussion of Diverter Test
- Late 2024/Early 2025 – Review of Diverter Test and other proposed improvements