Class 1 Notice of Contracts
Class 1 Notice of Contracts ($5,000 - $25,000)
Date Posted | Contract Title | Dollar Amount | City Agency | Staff Contact |
---|---|---|---|---|
10/14/2024 | Fire Station 7 parking lot drain pipe and concrete | $12,800 | Engineering | Steve White (608) 266-5963 |
10/01/2024 | Fabricate and install ductwork and registers for the Sign Shop process exhaust at Traffic Engineering Operations Facility, 1120 Sayle St. | $7,480 | Engineering | Jon Evans (608) 243-5893 |
8/16/2024 | Controls equipment, installation and programming for 1234 E Washington Ave. CARES Team office remodel | $12,690 | Engineering | Jon Evans (608) 243-5893 |
8/16/2024 | Ductwork fabrication and installation for 1234 E Washington Ave. CARES Team office remodel | $24,500 | Engineering | Jon Evans (608) 243-5893 |
8/7/2024 | Truax Apartments Solar Roof Attachments | $22,800 | Engineering | William McMahon (608) 261-9654 |
7/10/2024 | Plumbing Services - 1234 East Washington Ave. | $24,000 | Engineering | Steve White (608) 266-5969 |
5/17/2024 | Sanitary Sewer Force Main Repair | $10,571.53 | Engineering | Mark Moder (608) 261-9250 |
4/26/2024 | Door Modifications and Improvements, Metro, 1 S. Ingersoll. | $9,986 | Engineering | Jon Evans (608) 243-5893 |
3/15/2024 | Installation of gutter/downspouts at Engineering Services Building | $5,721 | Engineering | Matt Parks (608) 209-9677 |
1/12/2024 | Installation labor for replacement cooling unit at Water Utility network operations center | $29,989 | Engineering | Jon Evans (608) 243-5893 |
01/08/2024 | Gas line for Veith St. Generator Install | $7,495.00 | Engineering | Stephen King (608) 266-5927 |
12/20/2023 | 1 S. Ingersoll - Temporary Infill of Wall Openings at East Washington Elevation | $9,820 | Engineering | Jon Evans (608) 243-5893 |
12/20/2023 | Sycamore Streets East Generator | $9,481.00 | Engineering | Stephen King (608) 266-5927 |
12/12/2023 | Ventilation Fan Demolition Work in the Monona Terrace Tunnel | $20,058 | Engineering | Jon Evans (608) 243-5893 |
11/21/2023 | Building Automation System Install at Waste Transfer Station | $12,480 | Engineering | Jon Evans (608) 243-5893 |
9/20/2023 | Arborist services during construction of Mendota Grassman Greenway | $15,000 | Engineering | Jojo O'Brien (608) 266-9721 |
8/9/2023 | East Police Upper Roof Replacement | $29,836 | Engineering | William McMahon (608) 261-9654 |
5/12/2023 | Geothermal test bore and formation/thermal conductivity test for 1904 Bartillion Dr Homeless Shelter project. | $19,750 | Engineering | Jon Evans (608) 243-5893 |
5/12/2023 | Installation of Moisture Senors at North, South and West Police District Mechanical Mezzanines | $5,250 | Madison Police Department | Jon Evans (608) 243-5893 |
5/4/2023 | Solar Roof Anchor Installation for Police Training Facility | $20,000 | Engineering | William McMahon (608) 261-9654 |
4/14/2023 | Fire Alarm for Monona Terrace Tunnel | $41,272.47 | Engineering | Jon Evans (608) 243-5893 |
4/12/2023 | East Streets Facility Security System | $12,780 | Engineering/Streets | Mike Schuchardt (608) 261-9249 |
1/5/2023 | Metro Transit Generator Move | $8,434.00 | Engineering / Metro | Mike Schuchardt (608) 261-9249 |
1/4/2023 | Temporary construction in MMB 153 and CCB 104 | $19,188 | Engineering | Randy Wiesner (608) 267-8679 |
12/23/2022 | Bike Path Slab Replacement (E Washington bridge at Yahara River) | $7,850 | Engineering | Steve Sonntag (608) 267-1997 |
11/21/2022 | Storefront door replacement at Olbrich, 3330 Atwood Ave | $21,725 | Parks | Maria Delestre (608) 243-5891 |
11/3/2022 | Installation Labor for Condensing Unit at South Madison Police District | $20,000 | Madison Police Department | Jon Evans (608) 243-5893 |
9/15/2022 | Fire Station No. 14 Training Tower - Ladder Addition | $19,243.00 | Madison Fire Department | Mike Schuchardt 608-261-9249 |
9/12/2022 | Glass and Storefront Repairs at 2002 Zeier Rd. | $13,741 | Engineering/Clerk's Office | Maria Delestre (608) 243-5891 |
7/29/2022 | Clerk's Office Front Desk Security Upgrades | $9,387 | Engineering/Clerk's Office | Mike Schuchardt 608-261-9249 |
7/26/2022 | Epoxy Flooring at 2002 Zeier Rd. | $25,000 | Engineering | Maria Delestre (608) 243-5891 |
7/18/2022 | Acoustical Ceilings at 2002 Zeier Rd. | $13,930 | Engineering | Maria Delestre (608) 243-5891 |
7/18/2022 | Flooring Demolition at 2002 Zeier Rd. | $6,500 | Engineering | Maria Delestre (608) 243-5891 |
7/13/2022 | Clerks Office Security Glass | $5,638.00 | Engineering | Mike Schuchardt 608-261-9249 |
6/30/2022 | Test and Balance of HVAC System at 2002 Zeier Rd. | $9,470 | Engineering | Jon Evans 608-243-5893 |
6/28/2022 | Select Drywall at 2002 Zeier Rd. | $22,000 | Engineering | Maria Delestre 608-243-5891 |
6/23/2022 | Lutron Lighting Control Upgrade at Madison Municipal Building | $24,958 | Engineering | Jon Evans 608-243-5893 |
6/23/2022 | Concrete Saw Cutting at 2002 Zeier Rd. | $14,960 | Engineering | Maria Delestre 608-243-5891 |
6/23/2022 | Doors, Frames, and Hardware at 2002 Zeier Rd. | $24,938 | Engineering | Maria Delestre 608-243-5891 |
6/22/2022 | Airtight Exteriors at 2002 Zeier Rd. | $24,960 | Engineering | Maria Delestre 608-243-5891 |
6/9/2022 | General Electrical Work at 2002 Zeier Rd. | $24,900 | Engineering | Jon Evans 608-243-5893 |
6/8/2022 | Crowley Station ADA Access Ramp, UW 17 201 S. Hancock Street | $14,990.00 | Madison Water Utility | Tim Pearson 608-206-3956 |
5/26/2022 | Preventative Maintenance for 5 Rooftop Units at 2002 Zeier Rd. | $9,500 | Engineering | Jon Evans 608-243-5893 |
5/19/2022 | Sprinkler Modifications at 2002 Zeier Rd. | $24,994 | Engineering | Jon Evans 608-243-5893 |
5/16/2022 | Installation of Conduit and Door Position Switches at Fleet Headquarters, 4151 Nakoosa Trail | $24,900 | Engineering | Jon Evans 608-243-5893 |
5/4/2022 | Design and Install of a Fire Alarm System at 2002 Zeier Rd | $22,238.29 | Engineering | Jon Evans 608-243-5893 |
4/26/2022 | Gutter work at 4502 Milwaukee St. (Shield of Hope Shelter) | $9,950 | Engineering | Jon Evans 608-243-5893 |
3/7/2022 | Prescribed Burns and Follow Up Invasive Species Control | $8,570.00 | Engineering | Maddie Dumas 608-266-9525 |
2/22/2022 | DCR Conference Room 5th Floor CCB | $11,096 | Engineering | Jeanine Zwart 608-267-8749 |
1/31/2022 | Warner Park Pedestrian Bridge | $22,700 | Parks | Kate Kane 608-261-9671 |
1/4/2022 | Gates of Heaven Storm Windows | $19,952 | Engineering | Amy Scanlon 608-267-0743 |
11/3/2021 | Electrical Conduit for New Condenser at 1120 Sayle St. | $10,000 | Engineering | Jon Evans 608-243-5893 |
10/28/2021 | Madison Fire Station 6 Qualitative Air Barrier and Thermography Testing | $5,250 | Engineering | Jon Evans 608-243-5893 |
9/7/2021 | 3202 Dairy Drive Campground Site | $24,779 | Engineering | Bryan Cooper 608-261-5533 |
9/3/2021 | Controls upgrade at 1120 Sayle St. | $24,855 | Engineering | Jon Evans 608-243-5893 |
9/3/2021 | Installation of new condenser at 1120 Sayle St. | $24,813 | Engineering | Jon Evans 608-243-5893 |
6/11/2021 | Madison Police Central District Countertop Replacement | $26,303.00 | Engineering/MPD | Laura Amundson 608-243-5892 |
3/9/2021 | 4502 Milwaukee St. Roof Repairs | $7500 | Engineering | Jon Evans 608-243-5893 |
3/9/2021 | Madison Fire Station No. 7 Roof ice prevention system | $6,940.33 | Engineering | Mike Schuchardt 608-261-9249 |
2/16/2021 | Smoke Detector Install at 4502 Milwaukee St | $9900 | Engineering | Jon Evans 608-243-5893 |
2/3/2021 | Direct Purchase of Fire Alarm Equipment for 4502 Milwaukee St | $21,000 | Engineering | Jon Evans 608-243-5893 |
2/3/2021 | Design and Install of a Fire Alarm for 4502 Milwaukee St | $23,000 | Engineering | Jon Evans 608-243-5893 |
2/1/2021 | Smoke Sealing Walls at 4502 Milwaukee St . | $24,640 | Engineering | Jon Evans 608-243-5893 |
1/14/2021 | HVAC Repairs at Karmenta Nursing Home | $9900 | Engineering | Jon Evans 608-243-5893 |
11/23/2020 | Equipment upgrades to greenhouse warming tables | $9,500 | Parks/Engineering | Randy Wiesner 608-267-8679 |
10/12/2020 | Monona Terrace- Generator exhaust extension | $8,610 | Monona Terrace/Engineering | Jon Evans 608-243-5893 |
10/06/2020 | Monona Terrace - Concrete and Conduit Repair | $9670 | Monona Terrace/Engineering | Jon Evans 608-243-5893 |
10/06/2020 | Monona Terrace - Tunnel Exhaust Fan Electrical Repair | $2,184 | Monona Terrace/Engineering | Jon Evans 608-243-5893 |
9/18/2020 | MATC North Ditch Repair | $12,532 | Engineering | Sally Swenson 608-266-4862 |
9/18/2020 | MPD Central Property/GR10 Interior Wall Painting | $9850 | Engineering | Laura Amundson 608-243-5892 |
6/2/2020 | Foundation for pre-fab communications building, 10451 Old Sauk Rd | $24,950 | Engineering | Dave Schaller 608-243-5891 |
2/23/2020 | A/V Maintenance Support at Madison Muncipal Building | $31,120 | Engineering | Jon Evans 608-243-5893 |
2/19/2020 | Spring 2020 Prescribed Burns | $10,626.00 | Engineering | Maddie Dumas 608-266-9525 |
2/11/2020 | Grassman Pond Erosion Repair (2019) | $24,032 | Engineering | Carissa Wegner 608-261-9822 |
11/07/19 | Pinney Library Children's Area Vinyl on Glass | $7,900 | Madison Public Library/Engineering | Amy Scanlon 608-267-0743 |
10/28/19 | Villager Mall SF Energy Improvements | $9,900 | CDA | Jon Evans 608-243-5893 |
8/15/19 | Hazardous Waste Removal - Streets East | $17,465.25 | Engineering | Brent Pauba 608-266-4092 |
8/14/19 | Sequoya Library Boiler Controls | $19,760 | Engineering | Matt Gall 608-261-9620 |
8/14/19 | Sequoya Library Broiler Install | $24,670 | Engineering | Matt Gall 608-261-9620 |
6/4/19 | Split AC Cooling Unit for MMB Data Closet | $8,400 | Engineering | Jon Evans 608-243-5893 |
5/28/19 | Building Automation System Upgrades 2019 | $6,950 | Engineering | Jon Evans 608-243-5893 |
3/11/19 | Concrete work at Breese Stevens Field | $24,998 | Parks Div. | Mike Sturm 608-267-4921 |
2/7/19 | Central Library Conference Room Wall | $7,795 | Madison Public Library | Brian Jensen 608-266-6355 |