East Madison Bikeway Enhancement Projects

Prior to implementation of the BRT East/West system, the bicycle facilities along E. Washington Ave. were high-stress and generally inadequate relative to current City standards. Additionally, with the BRT project, those bike lanes are now utilized as part of a travel lane during peak hours. This project focuses on better connecting low-stress routes and providing options during peak hours.

Projects include:

  • E Mifflin Bike Boulevard Improvements
  • E Washington near Sparkle Ct Widened Sidewalk
  • Winnebago Ave Bicycle Connection Improvements
  • Hoard Street Bike Boulevard
  • E Washington near Starkweather Path Connection
  • E Main St Bike Boulevard

Project Details

E Mifflin Bicycle Boulevard Improvements

  • Project Page
  • Transportation Commission 12/11/2024
  • Approved:
    • E Mifflin/N Paterson Diverter
    • Midblock crossing near Lapham Elementary
    • Ingersoll St bump outs
  • Presentation (will open in a new window)
  • Project Schedule: Construction 2026

E Washington near Sparkle Ct Widened Sidewalk

Widening sidewalk to accommodate pedestrians and bicyclists from just east of the railroad tracks to Sparkle Ct and connection to Madison Public Market.

Winnebago Ave Bicycle Connection Improvements

Improving crosswalk markings, improve curb ramp and widen sidewalk to connect to the Union Corners Path.

Hoard St Bicycle Boulevard

Adding Bike Boulevard signs and marking along with Bicycle Wayfinding signage.

  • In Design
  • Project Schedule: Spring/Summer 2025

E Washington near Starkweather Path Connection

build a connection near the Starkweather Creek Path to provide an option to exit the East Washington Ave bike lane and reach the Starkweather Path and Hoard St.          

  • Transportation Commission - Presentation of Options - 11/20/24
    • Transportation Commission Preferred Option – Commercial Ave Connection (with curve)
    • In Design
  • Presentation (will open in a new window)
  • Project Schedule: To be determined

E Main St Bike Boulevard

Adding Bike Boulevard signs and marking with Bicycle Wayfinding signage.

  • In Design
  • Project Schedule: Summer/Fall 2025

City Process Meetings

Transportation Commission: December 12, 2024

  • The Transportation Commission approved construction of the following improvements:
  • E Mifflin/N Paterson Diverter
    • Midblock crossing near Lapham Elementary
    • Ingersoll St bump outs
  • Construction is anticipated in Spring 2026.

Transportation Commission: May 24, 2024

  • East Madison Bikeways Enhancement Project Update

Transportation Commission: July 31, 2024

  • E Mifflin Bike Boulevard Diverter Test

Board of Public Works: November 6, 2024

  • E Washington near Sparkle Ct Widened Sidewalk
  • Winnebago Bicycle Connections